THE WORK FOR THIS PROJECT SHALL CONSIST OF CONSTRUCTION OF A 55,816 SQ. FT. (APPROXIMATE) ELEMENTARY SCHOOL BUILDING, TOGETHER WITH SUPPOPRTING ITEMS OF WORK, ALL AS REEQUIRED BY, SPECIFIED IN, AND SHOWN ON THE CONTRACT DOCUMENTS FOR THIS PROJECT. PER APPROVED PLANS ON FILE WHICH WERE REVIEWED AND APPROVED BY THE STATE OF IDAHO DEPARTMENT OF LABOR AND INDUSTRIAL SERVICES.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 4/6/19984/6/1998 DONE
Details
INSP - Final9/25/19979/26/19979/26/1997APASS
DetailsJim Sly
09/25/97 316 - Final Occupancy.
INSP-Final Inspection9/2/19979/2/19979/2/1997 PASS
REINSP FOR FINAL OK FOR PERM OCC
INSP - Temporary occupancy8/28/19978/29/19979/2/1997APART
DetailsJim Sly
09/02/97 316 - Temp Occ.
INSP-Final Inspection8/28/19978/29/19978/29/1997ANR
DetailsJoe Tawney
08/29/97 406 - as early as possible NOT READY FOR INSP
INSP - Final8/21/19978/22/19978/22/1997AFAIL
DetailsJim Sly
08/21/97 316 - C/N...Need handrail stage stairs, req. signatures...lette by Hello! on 08/21/97 at 14:03:57.
INSP-Final Inspection8/15/19978/18/19978/18/1997AFAIL
DetailsJoe Tawney
08/17/97 406 - 8:30 A.M. FINAL FAIL ALARM SYSTEM CURB STRIPING & LETTERING
INSP-Conference7/29/19977/29/19977/29/1997PPASS
DetailsJoe Tawney
/ / 406 - CONF ON ALARM SYSTEM REQUIRE LETTER TO DEACTIVATE DOOR HOLD DECISION MADE
INSP-Final Inspection7/15/19977/21/19977/21/1997AFAIL
DetailsJoe Tawney
07/21/97 406 - FINAL FAIL NO APPROVED ALARM SUBMITTAL DEFICIENTSIES NOTE EXT CAB NEED MALLETS
INSP - Carpentry6/18/19976/19/19976/19/1997APASS
DetailsJim Sly
06/18/97 316 - Corridor Penitrations ..W. & N.wings OK...Also Gym and Ki
INSP - Ceiling grid6/18/19976/19/19976/19/1997APASS
DetailsJim Sly
06/18/97 316 - All Ceiling grid OK...thruout...
INSP - Final6/19/19976/19/19976/19/1997 PART
DetailsJoe Tawney
/ / 406 - TRIP TEST ON 2 DP SYSTEMS OK ON WATER TO END LINE TIMES
INSP-Sprinkler Rough-in/Hydro6/16/19976/18/19976/19/1997PFAIL
DetailsJoe Tawney
06/18/97 406 - SHELLY ###-#### TRIP TEST ON DP SYSTEMS FAIL
INSP - Ceiling grid6/17/19976/18/19976/18/1997ANR
DetailsJim Sly
06/17/97 316 - CEILING AND CARPENTRY INSP. Cancel...Will do Thurs AM
INSP - Ceiling grid6/16/19976/17/19976/17/1997APASS
DetailsJim Sly
06/16/97 316 - South wing OK
INSP - Carpentry6/16/19976/16/19976/16/1997 PASS
DetailsJim Sly
/ / 316 - Firecaulk wall penitrations South wing ...OK
INSP - Ceiling grid6/13/19976/16/19976/16/1997PPART
DetailsJim Sly
06/16/97 316 - CEILING CLOSE UP....OK D wing....East wing Only....
INSP - Ceiling grid6/3/19976/3/19976/3/1997 FAIL
DetailsJim Sly
/ / 316 - Inspection of grid East wing corridor and classrooms....stil engineering.
INSP - Wall cover6/3/19976/3/19976/3/1997 FAIL
DetailsJim Sly
/ / 316 - C/N...Seal all corridor penitrations /chpt 7..seal penitr ot
INSP - Ceiling grid5/29/19976/2/19976/2/1997AFAIL
DetailsJim Sly
05/30/97 316 - Need engineering...
INSP-Final Inspection5/22/19975/27/19975/27/1997APART
DetailsJoe Tawney
05/27/97 406 - OK ON PARTIAL HYDRO TEST 0F TWO DRY PIPE SYSTEMS. FDC ST
INSP - Final3/7/19973/7/19973/7/1997 CANC
DetailsJim Sly
03/07/97 316 - Wrong inspection sent ...Cancel
INSP - Framing/Rough-in2/19/19972/19/19972/19/1997 PASS
DetailsJim Sly
/ / 316 - All Sructural framing complete and OK pending approval and l Engineer.
INSP - Final2/12/19972/13/19972/18/1997APART
DetailsJoe Tawney
JENNIFER ###-#### OK TO COVER SPKLRS IN KITCHEN AND GYMNASIUM AREAS
INSP - Framing/Rough-in2/13/19972/13/19972/13/1997 PART
DetailsJim Sly
/ / 316 - Inspection of installation of 1hr shafts for boiler rm. and
INSP - Framing/Rough-in2/11/19972/12/19972/12/1997ACANC
DetailsJim Sly
02/12/97 316 - Cancel ...Will do 2/13/97
INSP - Framing/Rough-in1/23/19971/24/19971/24/1997PFAIL
DetailsJim Sly
01/23/97 316 - C/N ...Backwards truss ..missed bearing multi-purpose roo
INSP - Roof1/9/19971/10/19971/10/1997PPASS
DetailsJim Sly
01/10/97 316 - SHEATHING Multi-purpose Bldg. OK
INSP-Sprinkler Rough-in/Hydro1/10/19971/10/19971/10/1997PPART
DetailsJoe Tawney
STAN OR LINDA - ###-#### ROUGH IN OF ATTIC SPKLR SYSTEMS ADD HEAD FOR OBSTR OF DUCT PROVIDE PROTECTION IN SOFFIT ON EAST SIDE OK TO COVER GYM AREA NOT FINISHED
INSP - Energy code compliance1/7/19971/8/19971/8/1997PPART
DetailsJim Sly
01/08/97 316 - East and West wings.
INSP - Framing/Rough-in1/7/19971/8/19971/8/1997PPART
DetailsJim Sly
01/08/97 316 - West wing walls and Kitchen sheathing.
INSP - Framing/Rough-in12/24/199612/24/199612/24/1996 PART
DetailsJim Sly
/ / 316 - Inspection of ext. wall sheathing W. wing OK, Corridor for c OK, Interior lid for cover W. wing OK.
INSP - Framing/Rough-in12/12/199612/13/199612/13/1996APART
DetailsJim Sly
12/12/96 316 - SOUTH WING - AREA A for ceiling cover...OK
INSP - Carpentry12/5/199612/5/199612/5/1996 PASS
DetailsJim Sly
/ / 316 - East wing Draftstop OK.
INSP - Framing/Rough-in12/3/199612/3/199612/3/1996 PART
DetailsJim Sly
/ / 316 - Framing OK on East wing....Need to repair draftstop. Roof OK on West wing..
INSP - Framing/Rough-in11/27/199612/2/199612/2/1996PNR
DetailsJim Sly
12/02/96 316 - Roof sheathing west wing (partial) and East wing frame...
INSP - Framing/Rough-in11/26/199611/27/199611/27/1996PNR
DetailsJim Sly
11/27/96 316 - PARTIAL FRAMING Not Ready...Needs to patch holes in draft penitrations, wrap large electrical boxes with gyp, putty pack ect.
INSP - Roof11/19/199611/20/199611/19/1996PPASS
DetailsJim Sly
11/19/96 316 - Roof sheathing...south side, West wing...OK.
INSP - Framing/Rough-in11/8/199611/12/199611/12/1996AFAIL
DetailsJim Sly
11/11/96 316 - C/N for verification of detail for listed ceiling assembl
INSP - Wall cover11/4/199611/4/199611/4/1996 PART
DetailsJim Sly
/ / 316 - Roof sheathing nailing....south wing..OK.
INSP - Wall cover10/28/199610/28/199610/28/1996PPART
DetailsJim Sly
10/28/96 316 - Roof sheathing nailing East wing (part) OK.
INSP - Wall cover10/21/199610/22/199610/22/1996APASS
DetailsJim Sly
10/21/96 316 - Inspection of ext ply and roof sheathing attachment...Eas
INSP - Conference9/19/19969/19/19969/19/1996 PASS
DetailsJim Sly
/ / 316 - Talked to J C Murray (Super) about progression of project.
INSP - Footings8/9/19968/9/19968/9/1996 PASS
DetailsJim Storey
/ / 301 - FRMS-OK FORMS-REBAR 1st phase
INSP - Footings8/9/19968/9/19968/9/1996 PASS
DetailsJim Storey
/ / 301 - FRMS-OK FORMS-REBAR 1st phase
INSP - Footings8/7/19968/8/19968/8/1996APART
DetailsJim Storey
08/08/96 301 - LATE A.M. FRMS-OK FORMS-REBAR awing special insp on site pending report not comple set up.