INSP - Final | 9/3/1996 | 9/4/1996 | 9/4/1996 | P | PASS |
Jim Storey
|
|
|
09/04/96 301 - FINAL REINSPECT FNL -OK FINAL
|
INSP - Letter of compliance | 9/4/1996 | 9/4/1996 | 9/4/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED11579
|
INSP - Letter of compliance | 9/4/1996 | 9/4/1996 | 9/4/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED11579
|
INSP - Final | 9/3/1996 | 9/3/1996 | 9/3/1996 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N...Need mech. final and misc.
|
INSP - Final | 8/30/1996 | 9/3/1996 | 9/3/1996 | P | CANC |
|
|
|
09/03/96 338 - KEY ABOVE FRONT DOOR CANCELLED BY THE CONTRACTOR JEFF
|
INSP - Conference | 8/19/1996 | 8/19/1996 | 8/19/1996 | A | PASS |
|
|
|
verbal ok to cover over the phone
|
INSP - Energy code compliance | 8/19/1996 | 8/19/1996 | 8/19/1996 | A | PASS |
|
|
|
|
INSP - Framing/Rough-in | 8/19/1996 | 8/19/1996 | 8/19/1996 | A | PASS |
|
|
|
|
INSP - Framing/Rough-in | 8/16/1996 | 8/16/1996 | 8/16/1996 | P | PASS |
|
|
|
08/16/96 338 - pass
|
INSP - Framing/Rough-in | 8/12/1996 | 8/13/1996 | 8/13/1996 | P | |
|
|
|
FRAME REINSPECT
|
INSP - Framing/Rough-in | 8/12/1996 | 8/12/1996 | 8/12/1996 | P | FAIL |
|
|
|
08/12/96 338 - corrections left structural strapping energy etc ok to in
|
INSP - Footings | 7/10/1996 | 7/10/1996 | 7/10/1996 | P | NR |
|
|
|
07/10/96 338 - FOOT POURED W/O INSP
|
INSP - Foundation | 7/10/1996 | 7/10/1996 | 7/10/1996 | | NR |
|
|
|
/ / 338 - POURED W/O INSP
|