INSP - Final | 9/24/1996 | 9/26/1996 | 9/26/1996 | P | PASS |
Wes Worcester
|
|
|
READY AT 1:00...KEY ABOVE FRONT DOORS..ANY PROBLEMS PLEASE CALL ME, THANKS DIXIE
|
INSP - Letter of compliance | 9/26/1996 | 9/26/1996 | 9/26/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Footings | 9/13/1996 | 9/16/1996 | 9/16/1996 | A | FAIL |
Alan Hauser
|
|
|
09/16/96 350 - FOOTINGS FOR TWO COLUMNS FOR CARPORT ROOF ALREADY POURED, DEEPTH THEY ARE OR IF AS PER PLAN
|
INSP - Carpentry | 8/14/1996 | 8/14/1996 | 8/14/1996 | P | PASS |
Wes Worcester
|
|
|
DAVE PATTERSON truss fix ok 1 HOUR DEMISING WALLS ARE CORRECT FOR TOWNHOUSE BUT PENETRATIONS ARE WITHIN 5 FT
|
INSP - Framing/Rough-in | 8/12/1996 | 8/12/1996 | 8/12/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - redo truss fix rear of bldg..call when ready...ok to cover r
|
INSP - Energy code compliance | 8/9/1996 | 8/12/1996 | 8/11/1996 | A | PASS |
Wes Worcester
|
|
|
08/12/96 342 -
|
INSP - Framing/Rough-in | 8/9/1996 | 8/9/1996 | 8/9/1996 | P | FAIL |
Wes Worcester
|
|
|
08/09/96 342 - truss modification
|
INSP - Carpentry | 7/16/1996 | 7/16/1996 | 7/16/1996 | P | NR |
Wes Worcester
|
|
|
firewall
|
INSP - Conference | 7/16/1996 | 7/16/1996 | 7/16/1996 | P | PASS |
Wes Worcester
|
|
|
placing mineral wool as per plan of 10' oc draft stops
|
INSP - Carpentry | 7/15/1996 | 7/15/1996 | 7/15/1996 | P | CANC |
Jim Sly
|
|
|
07/15/96 316 - Gave to Wes.
|
INSP - Carpentry | 7/15/1996 | 7/15/1996 | 7/15/1996 | P | NR |
Wes Worcester
|
|
|
|
INSP - Conference | 7/15/1996 | 7/15/1996 | 7/15/1996 | P | PART |
Wes Worcester
|
|
|
nail GWB 7" oc if a townhouse conversion and draft stop 10' oc in 1" airspace
|
INSP - Footings | 7/1/1996 | 7/1/1996 | 7/1/1996 | P | PASS |
Wes Worcester
|
|
|
early pm mon.
|
INSP - Foundation | 7/1/1996 | 7/1/1996 | 7/1/1996 | P | PASS |
Wes Worcester
|
|
|
|