Permanent Occupancy | | 9/10/1997 | 9/10/1997 | | DONE |
|
|
|
|
Permanent Occupancy | | 9/10/1997 | 9/10/1997 | | DONE |
|
|
|
|
Permanent Occupancy | | 9/10/1997 | 9/10/1997 | | DONE |
|
|
|
|
INSP - Final | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | PASS |
|
|
|
09/04/97 338 - SIGNED THE PERM COL
|
INSP - Final | 8/28/1997 | 9/2/1997 | 9/2/1997 | P | NH |
|
|
|
09/02/97 338 - no access
|
INSP-Final Inspection | 8/25/1997 | 8/26/1997 | 8/27/1997 | P | PASS |
Joe Tawney
|
|
|
08/26/97 406 -
|
INSP-Final Inspection | 8/4/1997 | 8/7/1997 | 8/8/1997 | P | FAIL |
Joe Tawney
|
|
|
08/07/97 406 - 4:30 FINAL FAIL ALARM SYSTEM
|
INSP-Final Inspection | 7/22/1997 | 7/24/1997 | 7/22/1997 | P | CANC |
Joe Tawney
|
|
|
mike mason cancelled need to do work on the elevators
|
INSP - Final | 6/17/1997 | 6/17/1997 | 6/17/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK FOR TEMP OCC
|
INSP - Partial final | 4/18/1997 | 4/21/1997 | 4/21/1997 | A | PART |
|
|
|
04/22/97 338 - PARTIAL FINAL FOR T/O signed the temp co;for the 2nd floo only
|
INSP-Final Inspection | 4/16/1997 | 4/18/1997 | 4/18/1997 | A | PART |
Joe Tawney
|
|
|
04/18/97 406 - PARTIAL FINAL FOR T/O. MIKE- ###-#### OK FOR TEMP OCC OF 2ND FLOOR ONLY SPKLR & ALARM SYSTEMS OPERATIONAL
|
INSP-Final Inspection | 4/10/1997 | 4/14/1997 | 4/14/1997 | A | FAIL |
Joe Tawney
|
|
|
04/14/97 406 - PARTIAL -FOR TEMP.OCC. CHECK FIRE ALARM INSP OF 2ND FLOOR FOR TEMP OCC FAIL ALARM SUB HYDRO TEST ALARM SYST NOT COMPLETE ELEVATOR SYST NOT COMPL
|
INSP-Sprinkler Rough-in/Hydro | 4/14/1997 | 4/14/1997 | 4/14/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - SPKLR HYDRO TEST OK
|
INSP - Conference | 3/4/1997 | 3/5/1997 | 3/4/1997 | P | PASS |
|
|
|
03/05/97 338 - BEFORE 3 PM IF POSSIBLE
|
INSP - Ceiling grid | 2/18/1997 | 2/19/1997 | 2/19/1997 | A | PASS |
|
|
|
02/19/97 338 -
|
INSP - Conference | 1/2/1997 | 1/3/1997 | 1/1/1997 | A | PASS |
|
|
|
01/03/97 338 - fire caulk
|
INSP - Framing/Rough-in | 12/12/1996 | 12/12/1996 | 12/12/1996 | P | PASS |
|
|
|
12/12/96 338 - 2ND FLR.
|