INSP - Conference | 8/12/1996 | 8/12/1996 | 8/12/1996 | P | PART |
Wes Worcester
|
|
|
08/12/96 342 - 3 P.M.
|
INSP - Carpentry | 8/7/1996 | 8/7/1996 | 8/7/1996 | A | NR |
Wes Worcester
|
|
|
still not on site, nor has carpentry been corrected
|
INSP - Conference | 8/6/1996 | 8/7/1996 | 8/7/1996 | A | CANC |
Wes Worcester
|
|
|
CARPENTER WILL BE ON SITE. Postponed by owner. Numerous carpentry errors and have requested that we meet on site as frame was not ready ie needed other inspections on other visits
|
INSP - Carpentry | 7/31/1996 | 7/31/1996 | 7/31/1996 | P | FAIL |
Wes Worcester
|
|
|
|
INSP - Conference | 7/31/1996 | 7/31/1996 | 7/31/1996 | P | FAIL |
Wes Worcester
|
|
|
contractor to meet me on site
|
INSP - Framing/Rough-in | 7/31/1996 | 7/31/1996 | 7/31/1996 | P | FAIL |
Wes Worcester
|
|
|
contractor to meet me on site...numerous brng, carpentry items are incorrect, not done, etc
|
INSP - Footings | 7/8/1996 | 7/8/1996 | 7/8/1996 | P | PART |
Wes Worcester
|
|
|
poured w/o insp...carring porch and partial roof ld. Talked to contractor and from what he told me it was to the approved plan.
|
INSP - Foundation | 7/8/1996 | 7/8/1996 | 7/8/1996 | P | PART |
Wes Worcester
|
|
|
poured w/o inspection but looked ok
|