INSP - Conference | 12/11/1997 | 12/10/1997 | 12/10/1997 | A | PASS |
Carl Dependahl
|
|
|
w/ russ re insp records
|
INSP - Final | 12/9/1997 | 12/9/1997 | 12/9/1997 | A | PASS |
Carl Dependahl
|
|
|
SIGNED; CARD TO CONT. INITIALED CARD FOR MARV B...OK'D BY PHONE
|
Permanent Occupancy | | 12/9/1997 | 12/9/1997 | | DONE |
|
|
|
|
Permanent Occupancy | | 12/9/1997 | 12/9/1997 | | DONE |
|
|
|
|
INSP - Conference | 11/17/1997 | 11/17/1997 | 11/17/1997 | A | PASS |
Carl Dependahl
|
|
|
KEEP C/N, NEED ALL SIG'S ON CARD; I'LL CHK W/ CATHY TO SEE IF CARD DONE,(OR IF WE HAVE IT)... CONTRACTOR TO RECALL FOR FINAL.
|
INSP - Final | 7/2/1997 | 7/3/1997 | 7/7/1997 | A | NR |
Carl Dependahl
|
|
|
07/07/97 340 - READY AT 9...KEEP C/N, NEED OTHER FINALS
|
INSP - Carpentry | 7/2/1997 | 7/2/1997 | 7/2/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - KEEP C/N; OK FOR T/O IF ALL SIGNED OFF, CANT LOCATE CARD (W/
|
INSP - Final | 7/2/1997 | 7/2/1997 | 7/2/1997 | P | CANC |
Carl Dependahl
|
|
|
|
INSP-Final Inspection | 7/1/1997 | 7/2/1997 | 7/2/1997 | A | PASS |
Joe Tawney
|
|
|
07/01/97 406 - 8 -8:15 REINSP FOR FINAL OK FOR PERM OCC
|
INSP-Final Inspection | 6/30/1997 | 7/1/1997 | 7/1/1997 | A | FAIL |
Joe Tawney
|
|
|
07/01/97 406 - FINAL FAIL ELECT NOT WIRED TO SUPPRESSION SYSTEM ON HOOD MOUNT HAMMERS ON EXT CABINETS STRIPE CURB FOR FIRE ACCESS PROVIDE AIR BALANCE REPORT RETEST ANSUL SYSTEM
|
INSP - Final | 6/27/1997 | 6/30/1997 | 6/30/1997 | P | NR |
Carl Dependahl
|
|
|
06/30/97 340 - FIRE CODE FINAL????
|
INSP - Final | 6/27/1997 | 6/30/1997 | 6/30/1997 | P | FAIL |
Carl Dependahl
|
|
|
06/30/97 340 - C/N, NEED OTHER AGCYS, LANDING, DRAFT STOP.
|
INSP - Conference | 6/19/1997 | 6/20/1997 | 6/20/1997 | A | PASS |
Joe Tawney
|
|
|
06/20/97 406 - WENT THRU PLANS WITH CONTR
|
INSP - Ceiling grid | 6/13/1997 | 6/16/1997 | 6/16/1997 | A | PASS |
|
|
|
06/16/97 333 - CLG -OK CEILING COVER
|
INSP - Wall cover | 6/11/1997 | 6/11/1997 | 6/11/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - looked at 1 hr. shaft over hood on west side, also looked at through middle of attic
|
INSP - Framing/Rough-in | 5/8/1997 | 5/9/1997 | 5/9/1997 | A | PASS |
Alan Hauser
|
|
|
05/08/97 350 - shear wall nailing as per plans
|
INSP - Framing/Rough-in | 5/5/1997 | 5/6/1997 | 5/6/1997 | A | PASS |
Alan Hauser
|
|
|
05/06/97 350 - looked at roof nailing, which is as per plans
|
INSP - Framing/Rough-in | 5/2/1997 | 5/5/1997 | 5/5/1997 | P | NR |
Alan Hauser
|
|
|
05/05/97 350 - not ready til a.m. tuesday
|
INSP - Set-back | 5/5/1997 | 5/5/1997 | 5/5/1997 | | NR |
Alan Hauser
|
|
|
/ / 350 - will not be ready til a.m. tuesday
|
INSP - Foundation | 4/10/1997 | 4/11/1997 | 4/11/1997 | A | PASS |
Alan Hauser
|
|
|
04/11/97 350 - FND. REBAR ok, as per plan and specs
|
INSP - Conference | 4/8/1997 | 4/8/1997 | 4/8/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - supt. called, to say he wasn't going to pour til tomorrow
|
INSP - Footings | 4/8/1997 | 4/8/1997 | 4/8/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - ftns. as per plan
|
INSP - Foundation | 4/7/1997 | 4/8/1997 | 4/8/1997 | P | NR |
Alan Hauser
|
|
|
04/08/97 350 - FND. REBAR to be check in a.m.
|
INSP - Conference | 4/7/1997 | 4/7/1997 | 4/7/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - talked with project supt. about letter showing special inspe they are to look at
|
INSP - Foundation | 4/4/1997 | 4/7/1997 | 4/7/1997 | P | NR |
Alan Hauser
|
|
|
04/07/97 350 - FND.REBAR not ready, will recall
|