INSP - Final | 2/28/1997 | 2/28/1997 | 2/28/1997 | P | NH |
Jim Storey
|
|
|
02/28/97 301 - ISSUE KEY ABOVE THE DOOR SENT TO CARL.
|
INSP - Final | 2/28/1997 | 2/28/1997 | 2/28/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - C/N, NEED AIR SEAL, FASTEN GYP AT GAR. SENT TO 301 IN ERROR.
|
INSP - Misc. complaint | 10/10/1996 | 10/10/1996 | 10/11/1996 | P | PASS |
Carl Dependahl
|
|
|
10/10/96 340 - ADM.WANTS THIS CHECKED OUT. NO ONE PICKED UP THE PERMIT. THEY WANT TO KNOW IF ANYTHING IS GOING ON.... HAS FRAME INSP, CALLED CORY BARTON...PERMIT PAID PER "ACTIONS"
|
INSP - Energy code compliance | 9/16/1996 | 9/16/1996 | 9/16/1996 | P | PASS |
Carl Dependahl
|
|
|
09/16/96 340 - INS OK
|
INSP - Framing/Rough-in | 9/16/1996 | 9/16/1996 | 9/16/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - REINSP; NEED TO VERIFY FTG AT FRONT PORCH COL BRG ROOF, OK T
|
INSP - Framing/Rough-in | 9/13/1996 | 9/13/1996 | 9/13/1996 | P | FAIL |
Carl Dependahl
|
|
|
09/13/96 340 - C/N NEED TO BUILD BRG PONY WALL PER PLAN & BRACE. ADD FDN OK TO INS
|
INSP - Framing/Rough-in | 9/10/1996 | 9/10/1996 | 9/10/1996 | P | FAIL |
Carl Dependahl
|
|
|
09/10/96 340 - c/n, nr
|
INSP - Footings | 8/22/1996 | 8/22/1996 | 8/22/1996 | | CANC |
Carl Dependahl
|
|
|
08/08/96 340 - BY 301 OR 316
|
INSP - Footings | 8/8/1996 | 8/8/1996 | 8/8/1996 | P | PASS |
Jim Storey
|
|
|
08/08/96 301 - EAR-EARLY START POURED WITHOUT INSPECTION STBK-OK SETBACKS
|