INSP - Final | 11/5/1998 | 11/5/1998 | 11/5/1998 | P | PASS |
Bob Archibald
|
|
|
HANDRAIL--CINDY ###-####. CN made ok LC#104027 issued.
|
INSP - Final | 3/16/1998 | 3/13/1998 | 3/13/1998 | | FAIL |
|
|
|
Handrail not corrected. Other items made ok.
|
INSP - Final | 2/26/1998 | 2/26/1998 | 2/25/1998 | | FAIL |
|
|
|
CN issued.
|
INSP - Final | 2/24/1998 | 2/25/1998 | 2/25/1998 | P | PART |
Wes Worcester
|
|
|
02/25/98 342 - CINDY ###-####--given to Bob A w/list of outstanding c/n
|
INSP - Grading Inspection | 1/29/1998 | | 1/29/1998 | | PASS |
Rita DeYoung
|
|
|
Received final certification of grading from Dean Briggs. Grading is approved.
|
INSP - Final | 2/11/1997 | 2/13/1997 | 2/13/1997 | P | CANC |
Jim Storey
|
|
|
02/13/97 301 - please call Tim at ###-#### before going out unable to contact tim left message w/office to recall insp..
|
INSP - Framing/Rough-in | 11/22/1996 | 11/25/1996 | 11/25/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 11/20/1996 | 11/22/1996 | 11/22/1996 | A | FAIL |
Wes Worcester
|
|
|
EARLY FRI.AM. insulate hvac boot connection, transfer pt lds., repair cut tji, quick disconnects not allowed in concealed space.
|
INSP - Framing/Rough-in | 11/20/1996 | 11/22/1996 | 11/22/1996 | A | NR |
Wes Worcester
|
|
|
APT FRIDAY AM still not ready, working on c/n..ok to insulate
|
INSP - Carpentry | 10/29/1996 | 10/29/1996 | 10/29/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Conference | 10/24/1996 | 10/25/1996 | 10/29/1996 | P | PASS |
Wes Worcester
|
|
|
10/29/96 342 -
|
INSP - Conference | 10/2/1996 | 10/3/1996 | 10/3/1996 | A | PART |
Wes Worcester
|
|
|
increasing sq. ft. referred to front desk
|
INSP - Carpentry | 9/27/1996 | 9/27/1996 | 9/27/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Conference | 9/26/1996 | 9/27/1996 | 9/27/1996 | A | NR |
Wes Worcester
|
|
|
framer not there
|
INSP - Conference | 9/27/1996 | 9/27/1996 | 9/27/1996 | P | PART |
Wes Worcester
|
|
|
|
INSP - Conference | 9/24/1996 | 9/26/1996 | 9/26/1996 | A | NR |
Wes Worcester
|
|
|
postpone until 8 am Friday
|
INSP - Foundation | 8/19/1996 | 8/20/1996 | 8/20/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Footings | 8/14/1996 | 8/15/1996 | 8/15/1996 | P | NR |
Wes Worcester
|
|
|
THURS.P.M. still placing rebar
|
INSP - Site Preparation | 8/9/1996 | 8/12/1996 | 8/11/1996 | A | PART |
Wes Worcester
|
|
|
08/12/96 342 - CHECK OUT THE SOIL. ESTRADA ENGR.WILL BE ON THIS JOB. MO
|
INSP - Conference | 8/11/1996 | 8/11/1996 | 8/11/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|