Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD96-01914
StatusFinaled
Name THORNTON TIM P & CINDY S
Site Address 757 N QUARRY VIEW WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a new 4534 sf two story with basement single family dwelling with an attached 737 sf three car garage and approximatly 868 sf concrete/wood patio/stoops per approved plans and attached requirement list. (Basement=922sf) (First floor=1844sf) (Second floor=1768sf) ACHD # 96-0506. HILLSIDE PLAN CHECK # 575-96. PRP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final11/5/199811/5/199811/5/1998PPASS
DetailsBob Archibald
HANDRAIL--CINDY ###-####. CN made ok LC#104027 issued.
INSP - Final3/16/19983/13/19983/13/1998 FAIL
Handrail not corrected. Other items made ok.
INSP - Final2/26/19982/26/19982/25/1998 FAIL
CN issued.
INSP - Final2/24/19982/25/19982/25/1998PPART
DetailsWes Worcester
02/25/98 342 - CINDY ###-####--given to Bob A w/list of outstanding c/n
INSP - Grading Inspection1/29/1998 1/29/1998 PASS
DetailsRita DeYoung
Received final certification of grading from Dean Briggs. Grading is approved.
INSP - Final2/11/19972/13/19972/13/1997PCANC
DetailsJim Storey
02/13/97 301 - please call Tim at ###-#### before going out unable to contact tim left message w/office to recall insp..
INSP - Framing/Rough-in11/22/199611/25/199611/25/1996APASS
DetailsWes Worcester
INSP - Framing/Rough-in11/20/199611/22/199611/22/1996AFAIL
DetailsWes Worcester
EARLY FRI.AM. insulate hvac boot connection, transfer pt lds., repair cut tji, quick disconnects not allowed in concealed space.
INSP - Framing/Rough-in11/20/199611/22/199611/22/1996ANR
DetailsWes Worcester
APT FRIDAY AM still not ready, working on c/n..ok to insulate
INSP - Carpentry10/29/199610/29/199610/29/1996 PART
DetailsWes Worcester
/ / 342 -
INSP - Conference10/24/199610/25/199610/29/1996PPASS
DetailsWes Worcester
10/29/96 342 -
INSP - Conference10/2/199610/3/199610/3/1996APART
DetailsWes Worcester
increasing sq. ft. referred to front desk
INSP - Carpentry9/27/19969/27/19969/27/1996PPASS
DetailsWes Worcester
INSP - Conference9/26/19969/27/19969/27/1996ANR
DetailsWes Worcester
framer not there
INSP - Conference9/27/19969/27/19969/27/1996PPART
DetailsWes Worcester
INSP - Conference9/24/19969/26/19969/26/1996ANR
DetailsWes Worcester
postpone until 8 am Friday
INSP - Foundation8/19/19968/20/19968/20/1996APASS
DetailsWes Worcester
INSP - Footings8/14/19968/15/19968/15/1996PNR
DetailsWes Worcester
THURS.P.M. still placing rebar
INSP - Site Preparation8/9/19968/12/19968/11/1996APART
DetailsWes Worcester
08/12/96 342 - CHECK OUT THE SOIL. ESTRADA ENGR.WILL BE ON THIS JOB. MO
INSP - Conference8/11/19968/11/19968/11/1996 PASS
DetailsWes Worcester
/ / 342 -