INSP - Final | 10/3/1996 | 10/4/1996 | 10/4/1996 | A | CANC |
Jim Storey
|
|
|
10/04/96 301 - THIS WAS ALREADY SCHEDULED FOR THIS MORNING, BUT SHE SAID IT IS READY NOW
|
INSP - Final | 10/3/1996 | 10/4/1996 | 10/4/1996 | A | PASS |
Jim Storey
|
|
|
10/04/96 301 - KEY ABOVE DOOR...OR ELSE LOCK BOX IS SPI FNL -OK FINAL
|
INSP - Letter of compliance | 10/4/1996 | 10/4/1996 | 10/4/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 11575
|
INSP - Letter of compliance | 10/4/1996 | 10/4/1996 | 10/4/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 11575
|
INSP - Conference | 9/11/1996 | 9/11/1996 | 9/11/1996 | | PASS |
|
|
|
/ / 400 - confer wit chuck on insp
|
INSP - Energy code compliance | 9/11/1996 | 9/11/1996 | 9/11/1996 | | PASS |
|
|
|
/ / 400 -
|
INSP - Energy code compliance | 9/9/1996 | 9/10/1996 | 9/10/1996 | A | PASS |
|
|
|
09/09/96 400 -
|
INSP - Framing/Rough-in | 9/9/1996 | 9/10/1996 | 9/10/1996 | A | PASS |
|
|
|
09/09/96 400 -
|
INSP - Conference | 9/6/1996 | 9/6/1996 | 9/6/1996 | | PASS |
|
|
|
/ / 400 - confer with chuck on insp
|
INSP - Framing/Rough-in | 9/5/1996 | 9/6/1996 | 9/6/1996 | A | PASS |
|
|
|
09/05/96 400 - FRAME REINSPECT
|
INSP - Framing/Rough-in | 9/5/1996 | 9/5/1996 | 9/5/1996 | P | FAIL |
|
|
|
09/05/96 400 - left corr
|