INSP - Final | 10/11/1996 | 10/14/1996 | 10/14/1996 | A | PASS |
Alan Hauser
|
|
|
10/14/96 350 - FINAL
|
INSP - Letter of compliance | 10/14/1996 | 10/14/1996 | 10/14/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - C/C11935
|
INSP - Letter of compliance | 10/14/1996 | 10/14/1996 | 10/14/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - C/C11935
|
INSP - Energy code compliance | 9/6/1996 | 9/9/1996 | 9/9/1996 | A | PASS |
Alan Hauser
|
|
|
09/09/96 350 - INSULATION OK, OK TO COVER POSTED
|
INSP - Framing/Rough-in | 9/5/1996 | 9/6/1996 | 9/6/1996 | A | PASS |
Alan Hauser
|
|
|
09/06/96 350 - FRAME OK, OK TO INSULATE
|
INSP - Framing/Rough-in | 9/5/1996 | 9/5/1996 | 9/5/1996 | P | FAIL |
Alan Hauser
|
|
|
09/05/96 350 - FRAME OK BUT, THE ELECTRICAL HASN'T BEEN APPROVED. LEFT N
|
INSP - Footings | 8/12/1996 | 8/13/1996 | 8/13/1996 | A | PASS |
Alan Hauser
|
|
|
08/13/96 350 - SET BACKS OK ALREADY POURED
|