INSP - Final | 6/17/1997 | 6/17/1997 | 6/17/1997 | P | PASS |
|
|
|
06/18/97 338 - Final condos FNL -OK FINAL
|
Permanent Occupancy | | 6/17/1997 | 6/17/1997 | | DONE |
|
|
|
|
INSP - Temporary occupancy | 1/21/1997 | 1/22/1997 | 1/23/1997 | | PEND |
|
|
|
Bob Gallagher of Merit Homes called in request for Occup. Insp./ Art Yingling is scheduled to inspect/ request is for insp. of one bldg. - BONDING WILL BE REQUIRED. (CU-39-95/DR-85-95).
|
INSP - Final | 1/17/1997 | 1/21/1997 | 1/20/1997 | A | NR |
|
|
|
01/21/97 338 - NOT READY
|
INSP - Carpentry | 12/9/1996 | 12/9/1996 | 12/9/1996 | P | FAIL |
|
|
|
12/09/96 338 - CALL 45 MIN. ###-####. 1:30 PM need to use 1" ceiling t
|
INSP - Framing/Rough-in | 12/5/1996 | 12/5/1996 | 12/5/1996 | P | PASS |
|
|
|
12/05/96 338 - AFTER 3:30 PLEASE conf on handrails made ok
|
INSP - Energy code compliance | 11/22/1996 | 11/25/1996 | 11/25/1996 | A | PASS |
|
|
|
11/25/96 338 - INSL-OK INSULATION-ENERGY CODE
|
INSP - Framing/Rough-in | 11/22/1996 | 11/25/1996 | 11/25/1996 | A | PASS |
|
|
|
11/25/96 338 - madeok EINSPECT FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 11/19/1996 | 11/20/1996 | 11/21/1996 | P | PASS |
|
|
|
11/21/96 338 - made ok to ins.
|
INSP - Conference | 10/25/1996 | 10/25/1996 | 10/25/1996 | P | PASS |
|
|
|
10/25/96 339 -
|
INSP - Wall cover | 10/16/1996 | 10/17/1996 | 10/17/1996 | A | NR |
|
|
|
10/17/96 338 - this is a conference only
|
INSP - Conference | 10/3/1996 | 10/7/1996 | 10/6/1996 | P | PASS |
|
|
|
10/08/96 338 - pre job conference with ele,plmb,frm,and gneral.
|
INSP - Foundation | 9/30/1996 | 9/30/1996 | 9/26/1996 | P | PASS |
|
|
|
09/30/96 338 - rebar inspection r-bar placed
|
INSP - Footings | 9/26/1996 | 9/27/1996 | 9/26/1996 | A | PASS |
|
|
|
09/27/96 338 - setbacks appear ok r-bar placed
|
INSP - Final | 1/14/1997 | 1/14/1997 | 1/14/1996 | P | PASS |
Joe Tawney
|
|
|
OK FOR PERM OCC
|