Permit Information
Permit NumberBLD96-02045
StatusFinaled
Name AIRPORT
Site Address 3201 AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(BOISE AIR TERMINAL - UNDER CONCOURSE "B" - SKYWEST SPACE - BID #3) Fire sprinklers used to substitute for 1-hr fire-resistive construction of the building. To remodel the Skywest Airline Operations Area located under Concourse "B". Work is to include interior nonbearing walls and door infill all per approved drawings and plan check notes on file. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. This space is required to be separated from Concourse "B" by a horizontal 1-hr Occupancy Separation. PC-362-96 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Letter of compliance  12/18/1996 PASS
ISSUED #12381 C OF C BY MJW THIS DATE.
INSP - Final11/21/199611/21/199611/21/1996 PASS
DetailsJim Storey
/ / 301 - FNL -OK FINAL
INSP - Final11/18/199611/18/199611/18/1996 PASS
Details
/ / 405 -
INSP-Sprinkler Rough-in/Hydro11/15/199611/18/199611/18/1996PPASS
Details
11/18/96 405 - spklr ok
INSP - Framing/Rough-in10/21/199610/21/199610/21/1996 PASS
DetailsJim Storey
/ / 301 - FRAM-OK FRAMING