Permanent Occupancy | | 10/22/1997 | 10/22/1997 | | DONE |
|
|
|
|
Permanent Occupancy | | 10/22/1997 | 10/22/1997 | | DONE |
|
|
|
|
INSP - Final | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | PASS |
Wes Worcester
|
|
|
|
INSP-Final Inspection | 9/12/1997 | 9/12/1997 | 9/12/1997 | P | PASS |
|
|
|
|
INSP - Final | 8/12/1997 | 8/13/1997 | 8/13/1997 | P | NR |
Wes Worcester
|
|
|
08/13/97 342 - CALL FLOYD TO SEE WHAT TIME. WES COULD YOU CALL ME TO LE FLOYD HAVE IT SET FOR TOMORROW AFTERNOON OR NOT. THANKS PAT
|
INSP - Temporary occupancy | 8/5/1997 | 7/24/1997 | 7/24/1997 | | PASS |
|
|
|
Temp. Occ. Cert. #3434 issued 7-24-97 to Healthwise.
|
INSP - Final | 7/23/1997 | 7/23/1997 | 7/23/1997 | P | PART |
Wes Worcester
|
|
|
fire issues, caulking, and tempered glass
|
INSP-Final Inspection | 7/23/1997 | 7/23/1997 | 7/23/1997 | P | PART |
|
|
|
TEMP, C/N ISSUED, ITEMS TO BE CORRECTED IN 1 WK
|
INSP-Final Inspection | 7/16/1997 | 7/22/1997 | 7/22/1997 | A | FAIL |
|
|
|
ALARM TEST AND FINAL, RON NEED PHONE LINES AND DETECTORS FOR SFD'S
|
INSP - Ceiling grid | 7/1/1997 | 7/1/1997 | 7/1/1997 | P | PASS |
Wes Worcester
|
|
|
|
INSP-Final Inspection | 6/18/1997 | 6/18/1997 | 6/18/1997 | P | PART |
|
|
|
sprinkler close out ONLY, NO OCCUPANCY APPROVED,
|
INSP - Carpentry | 6/2/1997 | 6/2/1997 | 6/2/1997 | P | PASS |
|
|
|
/ / 333 - firewall ok
|
INSP - Carpentry | 6/2/1997 | 6/2/1997 | 6/2/1997 | P | PASS |
|
|
|
06/03/97 333 - firewall ok
|
INSP-Sprinkler Rough-in/Hydro | 4/25/1997 | 4/25/1997 | 4/28/1997 | P | PASS |
|
|
|
test at 2
|
INSP - Framing/Rough-in | 4/24/1997 | 4/24/1997 | 4/23/1997 | P | PASS |
|
|
|
04/24/97 333 - 1st floor west
|
INSP - Framing/Rough-in | 4/23/1997 | 4/23/1997 | 4/23/1997 | P | |
Wes Worcester
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 4/22/1997 | 4/23/1997 | 4/23/1997 | P | PART |
|
|
|
REVIEW ROUGH-IN CORRECTION NOTICE W/ TV atrium ok, balcony ok, need head ne stair bottom, door stop, need ug and above hydro
|
INSP-Supply line flush | 4/22/1997 | 4/23/1997 | 4/23/1997 | P | PASS |
|
|
|
FLUSH
|
INSP - Framing/Rough-in | 4/18/1997 | 4/21/1997 | 4/21/1997 | A | PART |
Alan Hauser
|
|
|
04/21/97 350 - looked at 2nd. flr. hard ceiling wires, need to add seism
|
INSP - Framing/Rough-in | 4/15/1997 | 4/15/1997 | 4/15/1997 | P | PASS |
|
|
|
EAST FIRST FLOOR
|
INSP - Framing/Rough-in | 4/14/1997 | 4/14/1997 | 4/14/1997 | | PASS |
|
|
|
04/15/97 333 - 1st floor east
|
INSP-Sprinkler Rough-in/Hydro | 4/8/1997 | 4/8/1997 | 4/8/1997 | P | PART |
|
|
|
ok to cover, still need to verify head locations, question on sprinkling balcony, control valve needs to be moved, ug needs to be flushed before making piping wet, still need ug and above hydro
|
INSP - Conference | 12/9/1996 | 12/9/1996 | 12/9/1996 | P | PART |
Wes Worcester
|
|
|
discussed 2 hr area separation walls
|