INSP - Final | 3/21/1997 | 3/21/1997 | 3/20/1997 | P | PASS |
|
|
|
03/21/97 333 - FNL -OK FINAL
|
INSP - Final | 3/19/1997 | 3/19/1997 | 3/20/1997 | P | FAIL |
Carl Dependahl
|
|
|
03/19/97 340 - FAIL
|
INSP - Final | 3/20/1997 | 3/20/1997 | 3/19/1997 | P | FAIL |
|
|
|
03/20/97 333 - not ready cn not made
|
INSP - Conference | 3/14/1997 | 3/14/1997 | 3/14/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - talked to contractor about what to do with basement so he co
|
INSP - Conference | 3/14/1997 | 3/14/1997 | 3/14/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - talked to contractor about what to do with basement so he co
|
INSP - Conference | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | FAIL |
Wes Worcester
|
|
|
met w/sub and general's rep reference resubmittals
|
INSP - Energy code compliance | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | PART |
Wes Worcester
|
|
|
upstairs only.....changes to be made
|
INSP - Framing/Rough-in | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | PART |
Wes Worcester
|
|
|
REINSPECTION upstairs only ok.....changes to be addresssed and ok to continue in upstairs as per changes that are applicable...note most problems are downstairs and Records has been alerted....
|
INSP - Site Preparation | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | FAIL |
Wes Worcester
|
|
|
need resubmittal for fdn wall poured w/o inspection, new footing, deletion of retaining wall, and movement of related drain..note moisture in basement & p/t wood req'd
|
INSP - Framing/Rough-in | 1/10/1997 | 1/10/1997 | 1/10/1997 | P | FAIL |
Wes Worcester
|
|
|
moisture in basement, engineer's letter of acceptance for walls poured w/o inspection, p/t or decay resistant wood, changes in design and drainage at interior walls needed.
|
INSP - Framing/Rough-in | 1/10/1997 | 1/10/1997 | 1/10/1997 | P | PART |
Wes Worcester
|
|
|
upstairs only ok to insulate, need to nail strap top plates, brace trusses, need approved plan on site, ck hold downs at garage face.
|
INSP - Carpentry | 1/7/1997 | 1/7/1997 | 1/7/1997 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Carpentry | 1/6/1997 | 1/7/1997 | 1/7/1997 | A | CANC |
Jim Sly
|
|
|
01/07/97 316 - Gave to Carl D.
|
INSP - Conference | 1/7/1997 | 1/7/1997 | 1/7/1997 | P | PART |
Wes Worcester
|
|
|
USE PRESSURE TREATED WOOD IN BASEMENT NEXT TO EARTH AND ADDRESS MOISTURE PROBLEM.
|
INSP - Conference | 1/7/1997 | 1/7/1997 | 1/7/1997 | P | PART |
Jim Sly
|
|
|
|
INSP - Foundation | 10/7/1996 | 10/7/1996 | 10/7/1996 | P | NH |
Wes Worcester
|
|
|
EARLY P.M. poured w/o inspection... comments were we were late
|
INSP - Footings | 9/30/1996 | 9/30/1996 | 9/30/1996 | P | NR |
Wes Worcester
|
|
|
|
INSP - Conference | 9/25/1996 | 9/25/1996 | 9/25/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - verify drain deletion
|
INSP - Conference | 9/25/1996 | 9/25/1996 | 9/25/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - verify drain deletion
|
INSP - Conference | 9/25/1996 | 9/25/1996 | 9/25/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - verify drain deletion
|
INSP - Foundation | 9/25/1996 | 9/25/1996 | 9/25/1996 | P | PART |
Wes Worcester
|
|
|
09/25/96 342 -
|
INSP - Footings | 9/19/1996 | 9/19/1996 | 9/19/1996 | P | PASS |
Alan Hauser
|
|
|
09/19/96 350 - ENGINEER WAS ON SITE AND HAS REFIGURED THE FOOTINGS AND R THE LOWER EAST FOOTINGS AS PER NEW DRAWINGS
|
INSP - Conference | 9/11/1996 | 9/11/1996 | 9/11/1996 | P | PASS |
Wes Worcester
|
|
|
PRE-INSPECTION FOR ENGINEERING. ###-#### OR ###-#### JEFF SNYDER BEFORE YOU GO OUT SO HE CAN MEET YOU THERE. should get engineers final design prior to pour
|
INSP - Site Preparation | 9/11/1996 | 9/11/1996 | 9/11/1996 | P | PART |
Wes Worcester
|
|
|
cleaning out fractured rock
|