To construct a new 2990sf two story single family dwelling with an attached 771sf three car garage and approximatly 576sf of concrete/wood patios/stoops per approved plans and attached requirement list. (First Floor=1306sf) (Main Floor=1684sf) ACHD # 96-1976. HILLSIDE HOME Plan check # 96-610. cu-43-90. PRP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final3/21/19973/21/19973/20/1997PPASS
Details
03/21/97 333 - FNL -OK FINAL
INSP - Final3/19/19973/19/19973/20/1997PFAIL
DetailsCarl Dependahl
03/19/97 340 - FAIL
INSP - Final3/20/19973/20/19973/19/1997PFAIL
Details
03/20/97 333 - not ready cn not made
INSP - Conference3/14/19973/14/19973/14/1997 PASS
DetailsAlan Hauser
/ / 350 - talked to contractor about what to do with basement so he co
INSP - Conference3/14/19973/14/19973/14/1997 PASS
DetailsAlan Hauser
/ / 350 - talked to contractor about what to do with basement so he co
INSP - Conference1/13/19971/13/19971/13/1997PFAIL
DetailsWes Worcester
met w/sub and general's rep reference resubmittals
INSP - Energy code compliance1/13/19971/13/19971/13/1997PPART
DetailsWes Worcester
upstairs only.....changes to be made
INSP - Framing/Rough-in1/13/19971/13/19971/13/1997PPART
DetailsWes Worcester
REINSPECTION upstairs only ok.....changes to be addresssed and ok to continue in upstairs as per changes that are applicable...note most problems are downstairs and Records has been alerted....
INSP - Site Preparation1/13/19971/13/19971/13/1997PFAIL
DetailsWes Worcester
need resubmittal for fdn wall poured w/o inspection, new footing, deletion of retaining wall, and movement of related drain..note moisture in basement & p/t wood req'd
INSP - Framing/Rough-in1/10/19971/10/19971/10/1997PFAIL
DetailsWes Worcester
moisture in basement, engineer's letter of acceptance for walls poured w/o inspection, p/t or decay resistant wood, changes in design and drainage at interior walls needed.
INSP - Framing/Rough-in1/10/19971/10/19971/10/1997PPART
DetailsWes Worcester
upstairs only ok to insulate, need to nail strap top plates, brace trusses, need approved plan on site, ck hold downs at garage face.
INSP - Carpentry1/7/19971/7/19971/7/1997PPASS
DetailsWes Worcester
INSP - Carpentry1/6/19971/7/19971/7/1997ACANC
DetailsJim Sly
01/07/97 316 - Gave to Carl D.
INSP - Conference1/7/19971/7/19971/7/1997PPART
DetailsWes Worcester
USE PRESSURE TREATED WOOD IN BASEMENT NEXT TO EARTH AND ADDRESS MOISTURE PROBLEM.
INSP - Conference1/7/19971/7/19971/7/1997PPART
DetailsJim Sly
INSP - Foundation10/7/199610/7/199610/7/1996PNH
DetailsWes Worcester
EARLY P.M. poured w/o inspection... comments were we were late
INSP - Footings9/30/19969/30/19969/30/1996PNR
DetailsWes Worcester
INSP - Conference9/25/19969/25/19969/25/1996 PART
DetailsWes Worcester
/ / 342 - verify drain deletion
INSP - Conference9/25/19969/25/19969/25/1996 PART
DetailsWes Worcester
/ / 342 - verify drain deletion
INSP - Conference9/25/19969/25/19969/25/1996 PART
DetailsWes Worcester
/ / 342 - verify drain deletion
INSP - Foundation9/25/19969/25/19969/25/1996PPART
DetailsWes Worcester
09/25/96 342 -
INSP - Footings9/19/19969/19/19969/19/1996PPASS
DetailsAlan Hauser
09/19/96 350 - ENGINEER WAS ON SITE AND HAS REFIGURED THE FOOTINGS AND R THE LOWER EAST FOOTINGS AS PER NEW DRAWINGS
INSP - Conference9/11/19969/11/19969/11/1996PPASS
DetailsWes Worcester
PRE-INSPECTION FOR ENGINEERING. ###-#### OR ###-#### JEFF SNYDER BEFORE YOU GO OUT SO HE CAN MEET YOU THERE. should get engineers final design prior to pour
INSP - Site Preparation9/11/19969/11/19969/11/1996PPART
DetailsWes Worcester
cleaning out fractured rock