INSP - Final | 7/16/1997 | 7/18/1997 | 7/18/1997 | A | PASS |
Jim Storey
|
|
|
07/18/97 301 - FNL -OK FINAL built as per the plan.
|
INSP - Letter of compliance | 7/18/1997 | 7/18/1997 | 7/18/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 12617
|
INSP - Letter of compliance | 7/18/1997 | 7/18/1997 | 7/18/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 12617
|
INSP - Final | 7/11/1997 | 7/11/1997 | 7/14/1997 | P | FAIL |
Jim Storey
|
|
|
07/14/97 301 - UP TO SIDE WALK LOOK TO RIGHT BIG TREE EYE LEVEL THERES A CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 1/10/1997 | 1/13/1997 | 1/13/1997 | A | PASS |
Jim Storey
|
|
|
01/13/97 301 - I THINK YOU WERE SUPPOSE TO DO THIS TODAY...(FRIDAY PM).. FRAM-OK FRAMING
|
INSP - Carpentry | 1/6/1997 | 1/7/1997 | 1/7/1997 | P | PASS |
Jim Storey
|
|
|
01/07/97 301 - FIREWALL nail ok
|
INSP - Energy code compliance | 12/9/1996 | 12/9/1996 | 12/9/1996 | P | PASS |
Jim Storey
|
|
|
12/09/96 301 - LATE PM INSL-OK INSULATION-ENERGY CODE
|
INSP - Framing/Rough-in | 12/5/1996 | 12/6/1996 | 12/6/1996 | A | PASS |
Jim Storey
|
|
|
12/05/96 301 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 11/26/1996 | 11/26/1996 | 11/26/1996 | P | FAIL |
Jim Storey
|
|
|
11/26/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Carpentry | 11/25/1996 | 11/25/1996 | 11/25/1996 | A | PART |
Wes Worcester
|
|
|
plan ck notes on approved plan are not to construction in lieu of a parapet criteria......
|
INSP - Conference | 11/26/1996 | 11/25/1996 | 11/25/1996 | | |
|
|
|
MET WITH WES WORCESTER, JIM STOREY AND BOB ARCHIBALD, AND MR DOUG BODINE. WE REVIEWD THE CONSTRUCTION AND THE APPROVED SET OF PLANS. AFTER REVIEWING WHAT HAD TAKEN PLACE VERSES THE PLAN SIT IS CONCLUDED THAT THE CONTRACTOR HAD BUILT PER HIS APPROVED SET OF PLANS AND THAT IS WHAT WOULD BE APPROVED. GS. 11-26-96 BOB GARRISSON AND I MET WITH MR BODINE ON SITE AND PICKED UP THE APPROVED SET OF PLANS WHICH IS IN CONFLICT WITH THE PLAN REVIEW NOTES AND WHAT THE PLAN REVIEWER RED LINED ON THE PLAN. MR GARRISSON WAS TO RESOVE THE ISSUE WITH HIS PLAN REVIEWER. THIS ISSUE IS CLOSED.
|
INSP - Conference | 11/22/1996 | 11/22/1996 | 11/22/1996 | | NH |
|
|
|
no answer on phone number ###-#### attempted twice
|
INSP - Conference | 11/18/1996 | 11/19/1996 | 11/19/1996 | A | PASS |
Jim Storey
|
|
|
11/19/96 301 - WIP -WORK IN PROGRESS
|
INSP - Carpentry | 11/13/1996 | 11/13/1996 | 11/13/1996 | P | FAIL |
Wes Worcester
|
|
|
c/n left re:1 hr construction in lieu of a parapet
|
INSP - Carpentry | 10/25/1996 | 10/28/1996 | 10/28/1996 | A | PASS |
Jim Storey
|
|
|
10/25/96 301 - COMMON WALL GWB -OK SHEETROCK NAILING
|
INSP - Carpentry | 10/16/1996 | 10/17/1996 | 10/17/1996 | A | PART |
Wes Worcester
|
|
|
10/17/96 342 - COMMON WALL. 8:30 APPOINTMENT
|
INSP - Conference | 10/17/1996 | 10/17/1996 | 10/17/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - need meeting with bldr, tji, (resubmittal)? and framer...Cal
|