INSP - Grading Inspection | 7/10/1997 | | 7/10/1997 | | PASS |
Rita DeYoung
|
|
|
Final revegetation has been completed. Released $1500.00 bond.
|
INSP - Letter of compliance | 2/5/1997 | 2/5/1997 | 2/5/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - c/c #11293
|
INSP - Letter of compliance | 2/5/1997 | 2/5/1997 | 2/5/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - c/c #11293
|
INSP - Final | 2/4/1997 | 2/4/1997 | 2/4/1997 | P | PART |
Alan Hauser
|
|
|
02/04/97 350 - HOUSE INSPECTION OK, STILL NEED ELECTRICAL FINAL, THAT IS AFTERNOON. WILL CHECK IN A.M. TOMORROW
|
INSP - Final | 2/4/1997 | 2/4/1997 | 2/4/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final
|
INSP - Energy code compliance | 11/21/1996 | 11/21/1996 | 11/21/1996 | P | PASS |
Alan Hauser
|
|
|
11/21/96 350 - THIS WAS DONE 11/20 AND HAS BEEN PASSED, WITH OK TO COVER
|
INSP - Energy code compliance | 11/20/1996 | 11/20/1996 | 11/20/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - INSULATION OK, OK TO COVER
|
INSP - Energy code compliance | 11/20/1996 | 11/20/1996 | 11/20/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - INSULATION OK, OK TO COVER
|
INSP - Framing/Rough-in | 11/20/1996 | 11/20/1996 | 11/20/1996 | P | PASS |
Alan Hauser
|
|
|
11/20/96 350 - FRAME OK
|
INSP - Framing/Rough-in | 11/18/1996 | 11/18/1996 | 11/18/1996 | P | PASS |
Alan Hauser
|
|
|
11/18/96 350 - FRAME OK, OK TO INSULATE
|
INSP - Foundation | 9/26/1996 | 9/26/1996 | 9/26/1996 | P | PASS |
Alan Hauser
|
|
|
09/26/96 350 - FND. WALL OK AS PER DRAWING
|
INSP - Footings | 9/23/1996 | 9/23/1996 | 9/23/1996 | P | PART |
Alan Hauser
|
|
|
09/23/96 350 - CALL TRAVIS BERMSTROM AT ###-#### SO HE CAN MEET YOU THER FTNS OK WILL CHECK WALL WITH REBAR WHEN READY
|