INSP - Final | 3/14/1997 | 3/17/1997 | 3/17/1997 | A | PASS |
Carl Dependahl
|
|
|
03/17/97 340 - FINAL REINSPECT; DUPLEX ONLY, 8980 & 8986
|
INSP - Letter of compliance | 3/17/1997 | 3/17/1997 | 3/17/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - DUPLEX ONLY; LC 8505
|
INSP - Letter of compliance | 3/17/1997 | 3/17/1997 | 3/17/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - DUPLEX ONLY; LC 8505
|
INSP - Final | 3/13/1997 | 3/14/1997 | 3/14/1997 | A | FAIL |
Carl Dependahl
|
|
|
03/14/97 340 - C/N, HTG FINAL, AIR SEAL
|
INSP - Energy code compliance | 11/22/1996 | 11/25/1996 | 11/25/1996 | A | PASS |
Carl Dependahl
|
|
|
11/22/96 340 - ok
|
INSP - Framing/Rough-in | 11/25/1996 | 11/25/1996 | 11/25/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - PART, NEED FULL BRG AT HSE/ GAR WALL (FND OUT OF SQ.) CHK AT
|
INSP - Energy code compliance | 11/21/1996 | 11/22/1996 | 11/22/1996 | P | FAIL |
Carl Dependahl
|
|
|
11/22/96 340 - INSULATION INSPECTION ...KEEP C/N, NOT READY
|
INSP - Framing/Rough-in | 11/22/1996 | 11/22/1996 | 11/22/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - KEEP C/N, NOT READY
|
INSP - Framing/Rough-in | 11/19/1996 | 11/21/1996 | 11/21/1996 | A | FAIL |
Carl Dependahl
|
|
|
11/20/96 340 - HAS A APT. WITH YOU; KEEP C/N, OK TO INSUL...NEED FULL BR WEST UNIT, WALL NOT SQUARE ON FND, SEE PREV C/N
|
INSP - Framing/Rough-in | 11/14/1996 | 11/15/1996 | 11/15/1996 | A | FAIL |
Carl Dependahl
|
|
|
11/14/96 340 - PART ONLY, NEED CLARIFICATION RE DUPLEX OR TOWNHOUSE...2
|
INSP - Footings | 9/12/1996 | 9/12/1996 | 9/12/1996 | P | PART |
Carl Dependahl
|
|
|
09/12/96 340 - pouring at 2:30 poured w/o insp, looks ok I TOLD THEM TO CALL YOU TO SEE IOF YOU COULD BE THERE BY THEN- ANGIE
|