INSP - Final | 6/18/1997 | 6/18/1997 | 6/18/1997 | | PASS |
|
|
|
06/16/97 333 - FNL -OK FINAL
|
INSP - Final | 6/17/1997 | 6/17/1997 | 6/17/1997 | P | |
|
|
|
CODE TO GATE STAR 5575
|
INSP - Final | 6/16/1997 | 6/16/1997 | 6/16/1997 | P | FAIL |
|
|
|
06/16/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPL
|
INSP - Letter of compliance | 6/16/1997 | 6/16/1997 | 6/16/1997 | | PASS |
|
|
|
06/16/97 333 - letter #12297
|
INSP - Final | 6/13/1997 | 6/13/1997 | 6/13/1997 | P | NH |
|
|
|
06/13/97 333 - no access
|
INSP - Energy code compliance | 2/14/1997 | 2/14/1997 | 2/14/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - insul ok, need to verify underfloor(wet)
|
INSP - Framing/Rough-in | 2/13/1997 | 2/14/1997 | 2/14/1997 | A | PART |
Carl Dependahl
|
|
|
02/14/97 340 - NEED TO VERIFY POINT LOADS UNDER FLOOR(WET CRAWL) PER C/N OK. OK TO COVER. LEFT C/N
|
INSP - Framing/Rough-in | 2/12/1997 | 2/13/1997 | 2/13/1997 | A | PART |
Alan Hauser
|
|
|
02/13/97 350 - corrections on frame, posted on front window ok to insula
|
INSP - Framing/Rough-in | 2/11/1997 | 2/11/1997 | 2/11/1997 | P | NH |
|
|
|
02/11/97 333 - gate locked UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
INSP - Footings | 12/16/1996 | 12/16/1996 | 12/16/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - ftns as per plan, setbacks ok
|
INSP - Footings | 12/16/1996 | 12/16/1996 | 12/16/1996 | P | PASS |
Alan Hauser
|
|
|
|
INSP - Footings | 9/23/1996 | 9/23/1996 | 9/23/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - FTNS OK ALREADY POURED, TWO ROWS OF REBAR IN FTNS. ADDED BY REQUIREMENT ON PLANS
|