Permanent Occupancy | | 12/18/1996 | 12/18/1996 | | DONE |
|
|
|
|
INSP - Final | 11/13/1996 | 11/13/1996 | 11/13/1996 | | PART |
Jim Sly
|
|
|
/ / 316 - Temp. Occ.
|
INSP - Final | 11/12/1996 | 11/13/1996 | 11/13/1996 | P | CANC |
|
|
|
11/13/96 338 - to be done by 316
|
INSP - Final | 11/12/1996 | 11/13/1996 | 11/13/1996 | A | PASS |
Joe Tawney
|
|
|
11/12/96 406 - FINAL REINSPECTION JACK HOUSE - ###-#### OK FOR PERM OCC OF GODFATHER PIZZA
|
INSP - Final | 11/8/1996 | 11/8/1996 | 11/8/1996 | | PASS |
|
|
|
OK FOR TEMP OCC C/N NOTICE ISSUED
|
INSP - Carpentry | 10/24/1996 | 10/25/1996 | 10/25/1996 | P | PASS |
|
|
|
10/25/96 338 - CEILING COVER SUITE D SCLG-OK SUSPENDED CEILING
|
INSP-Sprinkler Rough-in/Hydro | 10/24/1996 | 10/25/1996 | 10/25/1996 | A | PASS |
Joe Tawney
|
|
|
10/25/96 406 - RANDY - ###-#### OK SPKLR ROUGH IN OK TO COVER
|
INSP - Framing/Rough-in | 10/10/1996 | 10/11/1996 | 10/11/1996 | A | PASS |
|
|
|
10/11/96 338 - FRAME REINSPECT made ok
|
INSP - Framing/Rough-in | 10/9/1996 | 10/10/1996 | 10/10/1996 | P | FAIL |
Jim Storey
|
|
|
10/09/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OK TO ONESIDE
|