INSP - Final | 10/20/1997 | 10/21/1997 | 10/21/1997 | P | PASS |
Tom Arcoraci
|
|
|
10/21/97 408 - Kim made the last inspection in Sept. & issued a correction notice. They are now ready for a final and if you need access, enter thru the side door by the garage.
|
INSP - Letter of compliance | 10/21/1997 | 10/21/1997 | 10/21/1997 | | PASS |
Tom Arcoraci
|
|
|
/ / 408 -
|
INSP - Letter of compliance | 10/21/1997 | 10/21/1997 | 10/21/1997 | | PASS |
Tom Arcoraci
|
|
|
/ / 408 -
|
INSP - Final | 9/30/1997 | 9/30/1997 | 9/30/1997 | P | |
|
|
|
cn placed
|
INSP - Energy code compliance | 10/30/1996 | 10/31/1996 | 10/31/1996 | A | PASS |
|
|
|
|
INSP - Energy code compliance | 10/29/1996 | 10/29/1996 | 10/29/1996 | P | FAIL |
|
|
|
10/29/96 400 - insulation package not finished underfloor re-inspt due
|
INSP - Energy code compliance | 10/25/1996 | 10/28/1996 | 10/28/1996 | P | NR |
Wes Worcester
|
|
|
10/28/96 342 -
|
INSP - Framing/Rough-in | 10/25/1996 | 10/25/1996 | 10/25/1996 | P | PASS |
|
|
|
10/25/96 400 - FRAME REINSPECT engr'ing submitted by t cory on flr suppo
|
INSP - Energy code compliance | 10/22/1996 | 10/23/1996 | 10/23/1996 | P | FAIL |
|
|
|
10/23/96 400 - corr not addressed or completed from 10-22-96
|
INSP - Conference | 10/22/1996 | 10/22/1996 | 10/22/1996 | | PASS |
|
|
|
/ / 400 - confer with chuck on requiring field engr'ing fl support sys
|
INSP - Framing/Rough-in | 10/22/1996 | 10/22/1996 | 10/22/1996 | P | FAIL |
|
|
|
10/22/96 400 - FRAME REINSPECT left corr
|
INSP - Framing/Rough-in | 10/18/1996 | 10/21/1996 | 10/21/1996 | P | FAIL |
|
|
|
10/21/96 400 - mech not completed
|