BLD - Request for Extension | 11/4/2003 | 11/4/2003 | 11/4/2003 | P | PASS |
Dave Hannah
|
|
|
###-#### Tori///needs a final inspect. c.c # 23918 issued 11/4/2003 1:52:14 PM hill side signed off by terry recordes I talked to him at 1200 noon 11/4/2003 1:57:08 PM
|
BLD-Grading Inspection | 11/4/2003 | 11/4/2003 | 11/4/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
INSP - Wall cover | 3/20/1997 | 3/21/1997 | 3/20/1997 | A | FAIL |
|
|
|
03/21/97 333 - cn not found plumbing not passed
|
INSP - Framing/Rough-in | 3/12/1997 | 3/13/1997 | 3/13/1997 | A | PASS |
Alan Hauser
|
|
|
03/13/97 350 - frame ok, ok to insulate
|
INSP - Framing/Rough-in | 3/12/1997 | 3/12/1997 | 3/12/1997 | P | NR |
Alan Hauser
|
|
|
03/12/97 350 - still need mech. final
|
INSP - Carpentry | 2/18/1997 | 2/18/1997 | 2/18/1997 | P | FAIL |
Jim Storey
|
|
|
02/18/97 301 - SHEAR NAILING CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ì
|
INSP - Foundation | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | PART |
Wes Worcester
|
|
|
fnd.rebar walls partially done and those are ok
|
INSP - Footings | 11/26/1996 | 11/27/1996 | 11/27/1996 | P | PASS |
Wes Worcester
|
|
|
early pm. rebar
|