INSP - Final | 9/26/1997 | 9/26/1997 | 9/26/1997 | | PASS |
|
|
|
Final
|
INSP - Final | 9/26/1997 | 9/26/1997 | 9/26/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - Final OK
|
INSP - Final | 9/24/1997 | 9/24/1997 | 9/24/1997 | P | NR |
Jim Sly
|
|
|
/ / 316 - NR
|
INSP - Final | 9/22/1997 | 9/23/1997 | 9/23/1997 | A | CANC |
Joe Ray
|
|
|
RITA GAVE TO JOE RAY
|
INSP - Final | 9/23/1997 | 9/23/1997 | 9/23/1997 | P | FAIL |
Jim Sly
|
|
|
09/23/97 316 - Need Plumbing sign off....
|
INSP - Final | 9/22/1997 | 9/22/1997 | 9/22/1997 | P | FAIL |
Jim Sly
|
|
|
09/22/97 316 - C/N...Need all signatures occ req card...
|
INSP-Final Inspection | 9/22/1997 | 9/22/1997 | 9/22/1997 | P | CANC |
Joe Tawney
|
|
|
09/22/97 406 - CANCEL ALREADY SIGNED OFF SHOULD BE BLD97-1733
|
INSP - Final | 9/19/1997 | 9/19/1997 | 9/19/1997 | P | FAIL |
Jim Sly
|
|
|
/ / 316 - PHASE #1, SHELL C/N... Need all req. signatures, handrails, corr.....
|
INSP-Final Inspection | 9/19/1997 | 9/19/1997 | 9/19/1997 | P | PASS |
Joe Tawney
|
|
|
09/19/97 406 - REINSP FOR FINAL OK FOR CERT OF COMPL ON SHELL
|
INSP-Final Inspection | 9/18/1997 | 9/18/1997 | 9/18/1997 | P | FAIL |
Joe Tawney
|
|
|
09/18/97 406 - SHELL FINAL FAIL DOORS AND CLOSERS ON RATED CORRIDORS T ELEVATOR SHUNT TEST CONTROLLED ACCESS DOORS
|
INSP-Sprinkler Rough-in/Hydro | 9/10/1997 | 9/10/1997 | 9/10/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST AND ROUGH IN OF SPKLR SYSTEM
|
INSP - Framing/Rough-in | 7/31/1997 | 7/31/1997 | 7/31/1997 | P | FAIL |
Jim Sly
|
|
|
07/31/97 316 - Provide cont.Gyp membrane on both sides corridor as per p
|
INSP - Wall cover | 7/28/1997 | 7/28/1997 | 7/28/1997 | P | PART |
Jim Sly
|
|
|
07/28/97 316 - 1 side of corridor walls only...OK for cover....
|
INSP - Framing/Rough-in | 7/1/1997 | 7/2/1997 | 7/2/1997 | A | FAIL |
Jim Sly
|
|
|
07/01/97 316 - Main Floor and 2nd floor ext walls....main and 2nd floor continuous gyp at corridor bath ceiling intersection..Need archit detail
|
INSP - Framing/Rough-in | 6/17/1997 | 6/17/1997 | 6/17/1997 | P | FAIL |
Jim Sly
|
|
|
06/17/97 316 - Preliminary inspection of 1st floor corridor.....call whe
|
INSP - Conference | 4/1/1997 | 4/1/1997 | 4/1/1997 | | FAIL |
Jim Sly
|
|
|
/ / 316 - Provide engineering for roof change...submit to Mike Phillip
|
INSP - Foundation | 2/18/1997 | 2/18/1997 | 2/18/1997 | P | PART |
Jim Sly
|
|
|
02/18/97 316 - FND. REBAR ...OK Pending special inspection and approval.
|
INSP - Footings | 12/11/1996 | 12/12/1996 | 12/12/1996 | A | PART |
Jim Sly
|
|
|
12/11/96 316 - OK....Pending special inspector OK and approval. Interio
|
INSP - Footings | 12/10/1996 | 12/11/1996 | 12/11/1996 | P | NR |
Jim Sly
|
|
|
12/11/96 316 - Not ready.. will call in for tomorrow.
|
INSP - Footings | 12/6/1996 | 12/9/1996 | 12/9/1996 | A | NR |
Jim Sly
|
|
|
12/06/96 316 - Not Ready.
|
INSP - Foundation | 12/6/1996 | 12/9/1996 | 12/9/1996 | A | NR |
Jim Sly
|
|
|
12/06/96 316 - Not Ready
|