INSP - Final | 7/16/1997 | 7/16/1997 | 7/16/1997 | P | PASS |
Jim Sly
|
|
|
07/16/97 316 - C/C # 11764
|
INSP - Letter of compliance | 7/16/1997 | 7/16/1997 | 7/16/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 11764
|
INSP - Letter of compliance | 7/16/1997 | 7/16/1997 | 7/16/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 11764
|
INSP - Energy code compliance | 6/4/1997 | 6/4/1997 | 6/4/1997 | P | PASS |
Jim Sly
|
|
|
06/04/97 316 -
|
INSP - Framing/Rough-in | 6/4/1997 | 6/4/1997 | 6/4/1997 | P | PASS |
Jim Sly
|
|
|
06/04/97 316 - frame reinspect OK
|
INSP - Framing/Rough-in | 6/3/1997 | 6/3/1997 | 6/3/1997 | P | FAIL |
Jim Sly
|
|
|
06/03/97 316 - C/N...Misc carpentry chpt 23
|
INSP - Conference | 3/14/1997 | 3/17/1997 | 3/17/1997 | A | FAIL |
Jim Sly
|
|
|
03/14/97 316 - Walk thru...Need to call for final inspection
|
INSP - Footings | 10/8/1996 | 10/8/1996 | 10/8/1996 | | PART |
Jim Sly
|
|
|
/ / 316 - Poured W/O inspection...setbacks and soil appear OK no drawi
|
INSP - Footings | 10/7/1996 | 10/7/1996 | 10/7/1996 | P | PART |
Jim Sly
|
|
|
Poured W/O inspection ... Soil, Drainage appears OK.
|