Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD96-02475
StatusFinaled
Name TOP WOK
Site Address 12375 W CHINDEN BLVD Unit: C
Project NameBOISE RESEARCH CNTR
Customer Number 
ePlanReviewNo
Description
To finish a 1,711 sq.ft. tenant space for a new restaurant per approved plans on file. Work to include construction of kitchen area with 1-hr. shaft for type 1 hoods, fixed seating in dining area, 2 restrooms accessible by the disabled and finish. Maximum occupant load, to include waiting and seating, is 49. A sign is to be posted declaring such. Separate electrical, plumbing & mechanical permits are required. (P.C.#515-96)/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Carpentry12/6/199612/6/19969/22/1999PPART
DetailsJim Sly
12/06/96 316 - Demising walls suite C Partial.
Permanent Occupancy 1/23/19971/23/1997 DONE
Details
INSP - Final1/17/19971/22/19971/22/1997PPASS
DetailsJim Sly
01/22/97 316 - C/N Removed...Perm. Occ.
INSP - Final1/22/19971/22/19971/22/1997 CANC
DetailsJim Sly
01/22/97 316 - Cancel... did on 1/22/97
INSP - Final1/22/19971/22/19971/22/1997 CANC
DetailsJim Sly
01/22/97 316 - Cancel... did on 1/22/97
INSP - Final1/21/19971/21/19971/21/1997PPASS
DetailsJoe Tawney
partial final.....hood system, etc. jack warner-###-#### COMPLETE FINAL OK FOR PERM OCC
INSP-Sprinkler Rough-in/Hydro1/16/19971/16/19971/17/1997PFAIL
DetailsJoe Tawney
FINAL INSP FAILED SCHED TEST FOR ANSUL SYST MOUNT FIRE EXTS MOUNT OCC LOAD SIGN PROVIDE EMERG LIGHTS PER PLAN GET ELECT SIGN OFF
INSP - Final1/16/19971/16/19971/16/1997 NR
DetailsJim Sly
/ / 316 - NR
INSP - Final1/16/19971/16/19971/16/1997PNR
DetailsJim Sly
01/16/97 316 - NR
INSP - Final1/14/19971/15/19971/15/1997PCANC
DetailsAlan Hauser
01/15/97 350 - to be done by #340
INSP - Framing/Rough-in1/6/19971/7/19971/7/1997APASS
DetailsJim Sly
01/07/97 316 - UNIT C OK.
INSP - Carpentry12/20/199612/20/199612/20/1996PPASS
DetailsJim Sly
Inspection of 1st layer of 1hr shaft...OK
INSP - Framing/Rough-in12/13/199612/13/199612/13/1996 CANC
DetailsJim Sly
12/12/96 316 - SUITE C Did on 12/12/96
INSP - Energy code compliance12/11/199612/12/199612/12/1996PPASS
DetailsJim Sly
12/11/96 316 -
INSP - Framing/Rough-in12/11/199612/12/199612/12/1996PPASS
DetailsJim Sly
12/11/96 316 - SUITE C OK