INSP - Letter of compliance | 12/24/1996 | 12/24/1996 | 12/24/1996 | A | PASS |
Wes Worcester
|
|
|
c/c issued
|
INSP - Final | 12/24/1996 | 12/23/1996 | 12/24/1996 | A | FAIL |
Wes Worcester
|
|
|
still working on bcec
|
INSP - Final | 12/20/1996 | 12/23/1996 | 12/23/1996 | P | FAIL |
Wes Worcester
|
|
|
bcec not done
|
INSP - Final | 12/19/1996 | 12/20/1996 | 12/19/1996 | P | |
|
|
|
AS LATE AS POSSIBLE
|
INSP - Final | 12/18/1996 | 12/19/1996 | 12/19/1996 | P | NH |
Wes Worcester
|
|
|
locked
|
INSP - Carpentry | 11/13/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
Wes Worcester
|
|
|
spot insp ok
|
INSP - Conference | 11/12/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
Wes Worcester
|
|
|
APPT. 3 PM.
|
INSP - Energy code compliance | 11/13/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
Wes Worcester
|
|
|
spot insp ok
|
INSP - Framing/Rough-in | 11/13/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Conference | 11/6/1996 | 11/6/1996 | 11/6/1996 | | NR |
Wes Worcester
|
|
|
/ / 342 - contractor called...supposedly Kim looked at....last entry o ready. Bldr to call Kim for clarification and tags and c/n for mech
|
INSP - Conference | 11/6/1996 | 11/6/1996 | 11/6/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - talked to contractor's answering machine?
|
INSP - Wall cover | 11/6/1996 | 11/6/1996 | 11/6/1996 | P | FAIL |
Wes Worcester
|
|
|
11/06/96 342 - SHEETROCK Why....no c/n.....no frame sticker?????
|
INSP - Framing/Rough-in | 10/31/1996 | 11/1/1996 | 11/1/1996 | A | FAIL |
|
|
|
11/01/96 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 10/30/1996 | 10/31/1996 | 10/31/1996 | A | FAIL |
|
|
|
not ready
|
INSP - Foundation | 10/3/1996 | 10/3/1996 | 10/3/1996 | P | PASS |
|
|
|
10/03/96 400 - STEMWALL
|
INSP - Footings | 10/2/1996 | 10/2/1996 | 10/2/1996 | P | PASS |
|
|
|
10/02/96 400 - property line net 5' on each side
|