INSP - Conference | 3/20/1997 | 3/20/1997 | 3/20/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - HAS ENG'S LETTER, TOLD TO GET L/C AT OFFICE WHEN PRESENTING INSPECTED
|
INSP - Final | 3/19/1997 | 3/20/1997 | 3/20/1997 | A | PASS |
Carl Dependahl
|
|
|
03/20/97 340 - FINAL REINSPECT NEED LETTERS
|
INSP - Final | 3/20/1997 | 3/20/1997 | 3/20/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - C/N OK; GET L/C AT OFFICE W/ COPY OF ENG'S REPORT SUBMITTED AREA
|
INSP - Final | 3/12/1997 | 3/13/1997 | 3/13/1997 | A | FAIL |
Alan Hauser
|
|
|
03/13/97 350 - no final, corrections posted, (two copies)
|
INSP - Grading Inspection | 3/12/1997 | | 3/12/1997 | | PASS |
Rita DeYoung
|
|
|
Received engineer's certification letter, inspected and approved final grading.
|
INSP - Carpentry | 12/23/1996 | 12/23/1996 | 12/23/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - MET W/ BLDR, WILL HAVE TRUSS "FIX" FOR TRIPLE GIRDER, TRUSS ASSIST LOAD SHARING. OK TO COVER PER GS. 342 AREA
|
INSP - Energy code compliance | 12/23/1996 | 12/23/1996 | 12/23/1996 | P | PART |
Wes Worcester
|
|
|
he is dry walling now/couldn/t wait any longer. his first call for inspection was 12/19/96. and 12/20/96. george slane reviewd energy code with contractor. ok and ok to cover. Carl checked ..ok ok per 305
|
INSP - Energy code compliance | 12/20/1996 | 12/20/1996 | 12/20/1996 | P | CANC |
Wes Worcester
|
|
|
TRUSS DETAIL BEING DRAWN & WILL BE DONE THIS PM. could not get due to weather
|
INSP - Energy code compliance | 12/18/1996 | 12/19/1996 | 12/19/1996 | P | CANC |
Wes Worcester
|
|
|
ran out of daylight... will do on Friday
|
INSP - Framing/Rough-in | 12/16/1996 | 12/17/1996 | 12/17/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Foundation | 10/15/1996 | 10/16/1996 | 10/16/1996 | A | PASS |
Wes Worcester
|
|
|
10/16/96 342 -
|
INSP - Footings | 10/14/1996 | 10/15/1996 | 10/15/1996 | A | PASS |
Wes Worcester
|
|
|
10/15/96 342 -
|