INSP - Final | 4/23/1997 | 4/23/1997 | 4/23/1997 | P | PASS |
Jim Storey
|
|
|
04/23/97 301 - KEY ABOVE DOOR. FNL -OK FINAL
|
INSP - Final | 4/16/1997 | 4/17/1997 | 4/17/1997 | P | NH |
Carl Dependahl
|
|
|
04/17/97 340 - NO ACCESS,LATE
|
INSP - Final | 3/31/1997 | 4/1/1997 | 4/1/1997 | A | CANC |
Jim Storey
|
|
|
04/01/97 301 - KEY ABOVE FRONT OR BACK DOOR
|
INSP - Framing/Rough-in | 12/5/1996 | 12/6/1996 | 12/6/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Energy code compliance | 12/4/1996 | 12/4/1996 | 12/4/1996 | P | PART |
Wes Worcester
|
|
|
that that was done is ok
|
INSP - Framing/Rough-in | 12/3/1996 | 12/4/1996 | 12/4/1996 | P | FAIL |
Wes Worcester
|
|
|
|
INSP - Conference | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | PART |
Wes Worcester
|
|
|
attempted to return Brandon's phone call
|
INSP - Framing/Rough-in | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | FAIL |
Wes Worcester
|
|
|
approved plan not on site, bcec infiltration not ready, no insp
|
INSP - Footings | 10/28/1996 | 10/29/1996 | 10/29/1996 | P | FAIL |
|
|
|
10/28/96 400 - poured proir to inspection
|
INSP - Conference | 10/25/1996 | 10/25/1996 | 10/25/1996 | | PASS |
|
|
|
/ / 400 - confer with concrete contractor, not graded properly
|
INSP - Footings | 10/24/1996 | 10/25/1996 | 10/25/1996 | A | CANC |
|
|
|
10/24/96 400 -
|