INSP - Final | 3/27/1997 | 3/28/1997 | 3/28/1997 | A | PASS |
Jim Storey
|
|
|
03/28/97 301 - FNL -OK FINAL
|
INSP - Letter of compliance | 3/28/1997 | 3/28/1997 | 3/28/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 13754#
|
INSP - Letter of compliance | 3/28/1997 | 3/28/1997 | 3/28/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 13754#
|
INSP - Energy code compliance | 2/4/1997 | 2/4/1997 | 2/4/1997 | P | PASS |
|
|
|
02/04/97 333 - INSL-OK INSULATION-ENERGY CODE
|
INSP - Framing/Rough-in | 1/27/1997 | 1/27/1997 | 1/26/1997 | P | PART |
|
|
|
01/27/97 338 - FRAME REINSPECT MADE OK TO INSULATE MINOR CORRECTIOND ON DEPTH AND FIRE BLOCKING TO BE CHECKED BY THE NEXT INSPECTOR.
|
INSP - Framing/Rough-in | 1/16/1997 | 1/17/1997 | 1/17/1997 | P | FAIL |
Carl Dependahl
|
|
|
01/17/97 340 - FRAME REINSPECT...KEEP C/N, NEED COMPLETE FIREBLOCKING, E
|
INSP - Framing/Rough-in | 1/16/1997 | 1/16/1997 | 1/16/1997 | P | FAIL |
Wes Worcester
|
|
|
FRAME REINSPECTION....still not done
|
INSP - Framing/Rough-in | 1/13/1997 | 1/14/1997 | 1/14/1997 | A | FAIL |
Wes Worcester
|
|
|
truss brace, stair rise varies 7" to 8", hgr missing, eng req'd for tji's utilized for lateral restraint of basement wall, place clips on posts as per plan, transfer pt lds, dbl joists as req'd
|
INSP - Footings | 10/18/1996 | 10/21/1996 | 10/21/1996 | A | FAIL |
|
|
|
10/20/96 400 - could not locate
|