Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD96-02708
StatusFinaled
Name ROUNDTREE AUTOMOTIVE
Site Address 9501 W FAIRVIEW AVE
Project NameROUNDTREE AUTOMOTIVE
Customer Number 
ePlanReviewNo
Description
(AUTOMOTIVE PARTS AND OFFICE SHELL AND CORE BUILDING) TO BUILD A NEW 25,825 SQ. FT., TWO STORY, PARTS SALES AND STORAGE BUILDING WITH AUTOMOBILE DEALERSHIP RELATED ADMINISTRATIVE OFFICES AND A FOOD DELI. THIS BUILDING IS CONSTRUCTED OF A STEEL STRUCTURAL FRAME, CONCRETE SLAB FLOORS, METAL ROOF DECK AND METAL STUD EXTERIOR WALLS WITH AN EXTERIOR INSULATION FINISH SYSTEM. THIS BUILDING IS FULLY FIRE SPRINKLED AND USED FOR ONE-HOUR FIRE-RESISTIVE SUBSTITUTION. THIS PERMIT ALSO INCLUDES CONSTRUCTION OF RELATED SITE IMPROVEMENTS. THIS IS A SHELL AND CORE PERMIT ONLY. A TENANT IMPROVEMENT PERMIT WILL BE REQUIRED TO FINISH THIS BUILDING. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. ( FIRST FLOOR 13,085 SQ.FT., SECOND FLOOR 12,740 SQ. FT.) PC# 508-96/DR-92-95-9501/CU-46-95/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/23/19979/24/19979/24/1997ACANC
DetailsRick Jackson
they will reschedule, they were at the funeral
INSP-Final Inspection8/26/19978/26/19978/26/1997 PASS
OK FOR CERT OF COMPL
INSP - Conference6/17/19976/17/19976/17/1997 PASS
Details
/ / 338 - with Gslane and THogland on the smoke curtain board and revi with out the approval of the building department
INSP - Partial final6/16/19976/17/19976/17/1997APART
Details
06/17/97 338 - REINSPECT ON PARTIAL FINAL FOR T/O. signed the temp col and delivered the temp occ cert to the jobsite
INSP - Partial final6/16/19976/16/19976/16/1997PNR
Details
06/16/97 338 - c/n issuedR TEMP.OCC.
INSP-Final Inspection6/13/19976/16/19976/16/1997APART
DetailsJoe Tawney
06/16/97 406 - FINAL FOR C/O REINSP FOR FINAL OK FOR TEMP OCC
INSP - Framing/Rough-in5/7/19975/7/19975/6/1997PNR
Details
05/07/97 333 - interior frame reinspection elect not done
INSP - Framing/Rough-in4/30/19975/1/19975/1/1997AFAIL
DetailsCarl Dependahl
05/01/97 340 - INTERIOR FRAMING 2ND FLOOR; 2 P. C/N RE FIRESTOPS, CLARIF AT LOBBY & STAIRS, 2 HR WALL, ETC. VERIFY OTHER R/I'S. PARTIAL ONLY
INSP - Framing/Rough-in4/2/19974/7/19974/6/1997ANR
Details
04/07/97 338 - INTERIOR STEEL STUDS. 1ST FLOOR ONLY OUT OF TIME WILL D
INSP - Framing/ Rough-in4/6/19974/6/19974/6/1997 PASS
Details
/ / 338 - INTERIOR WALL FRAMING ONLY VERBAL INFO AND MINOR CORRECTIONS ONLY
INSP - Framing/Rough-in3/14/19973/17/19973/16/1997APASS
Details
03/17/97 338 - ext walls of the service center ext layer only
INSP - Conference3/16/19973/16/19973/16/1997 PART
Details
/ / 338 - with Bruce Poe the mezz is to be lowered to accomodate the p and the purlin is to be removed from the doorway and the ramp area
INSP - Footings1/16/19971/17/19971/17/1997APART
DetailsCarl Dependahl
01/17/97 340 - footing columns...338 AREA, PART,PENDING SPEC. INSP REPOR
INSP - Final1/12/19981/12/19981/12/1997APASS
Details
signed the final col of the card
INSP - Footings12/6/199612/9/199612/9/1996APART
DetailsCarl Dependahl
12/09/96 340 - COLUMN FOOTINGS...PENDING SPEC. INSP REPORT
INSP - Masonry12/3/199612/4/199612/4/1996PPASS
Details
12/04/96 338 - COLUMNS & FOOTINGS. r-bar placed special insp ok weather
INSP - Footings11/15/199611/15/199611/15/1996PPASS
Details
11/15/96 338 - made ok special insp signed off