INSP - Final | 1/12/1998 | 1/12/1998 | 1/12/1998 | A | PASS |
|
|
|
c/c issued 015505
|
INSP - Letter of compliance | 1/12/1998 | 1/12/1998 | 1/12/1998 | A | PASS |
|
|
|
issued 015505
|
INSP-Final Inspection | 8/26/1997 | 8/26/1997 | 8/26/1997 | | PASS |
|
|
|
REINSP FOR FINAL OK FOR CERT OF COMPL
|
INSP - Final | 6/12/1997 | 6/13/1997 | 6/13/1997 | A | PART |
|
|
|
06/13/97 338 - signed the temp col temp ok only
|
INSP - Final | 6/12/1997 | 6/12/1997 | 6/12/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR TEMP ON SHELL AND CORE
|
INSP - Final | 6/6/1997 | 6/6/1997 | 6/6/1997 | P | FAIL |
Joe Tawney
|
|
|
06/06/97 406 - FINAL ON SHELL AND CORE FAIL ADDRESS, FIRE EXT, DOOR HDWR
|
INSP - Framing/Rough-in | 2/24/1997 | 2/25/1997 | 2/25/1997 | P | PART |
|
|
|
02/25/97 338 - HE ASKED FOR "STEEL STUD INTERIOR" OK TO COVER WITH CONFI AGENCIES SIGNOFFS ì
|
INSP - Framing/Rough-in | 2/3/1997 | 2/4/1997 | 2/4/1997 | A | PART |
|
|
|
02/04/97 338 - STEEL STUDS ext walls only ok to covwr 1 side waiting for
|
INSP - Flatwork | 12/10/1996 | 12/10/1996 | 12/10/1996 | P | PART |
Carl Dependahl
|
|
|
12/10/96 340 - FLOOR POUR ...PENDING SPEC INSP REPORT
|
INSP - Footings | 11/22/1996 | 11/25/1996 | 11/25/1996 | A | PART |
Carl Dependahl
|
|
|
11/22/96 340 - 6 COL. BASES AT N. CENRAL AREA, SPEC INSP(TERRACON) ONSIT
|
INSP - Footings | 11/12/1996 | 11/13/1996 | 11/13/1996 | A | PASS |
|
|
|
11/13/96 338 - ok to pour main column footings after special insp is pas
|