INSP - Final | 4/30/1997 | 4/30/1997 | 4/30/1997 | P | PASS |
Alan Hauser
|
|
|
04/30/97 350 - key above door final
|
INSP - Letter of compliance | 4/30/1997 | 4/30/1997 | 4/30/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - c/c #13355
|
INSP - Letter of compliance | 4/30/1997 | 4/30/1997 | 4/30/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - c/c #13355
|
INSP - Energy code compliance | 11/13/1996 | 11/14/1996 | 11/14/1996 | A | PASS |
Alan Hauser
|
|
|
11/14/96 350 - CORRECTIONS ON INSULATION FIXED, OK TO COVER
|
INSP - Energy code compliance | 11/6/1996 | 11/7/1996 | 11/7/1996 | A | FAIL |
Alan Hauser
|
|
|
11/07/96 350 - INSULATION FAILED, HAVE ASK FOR COREY BARTON TO INSPECT T AREAS THAT DOES NOT HAVE ANY INSULATION IN EXTERIOR WALLS. $42 REINSPECTION FEE
|
INSP - Framing/Rough-in | 11/6/1996 | 11/6/1996 | 11/6/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - ALL CORRECTIONS FIXED
|
INSP - Framing/Rough-in | 11/4/1996 | 11/5/1996 | 11/5/1996 | A | PART |
Alan Hauser
|
|
|
11/05/96 350 - STILL CORRECTIONS, OK TO INSULATE
|
INSP - Framing/Rough-in | 11/1/1996 | 11/1/1996 | 11/1/1996 | | FAIL |
Alan Hauser
|
|
|
11/01/96 350 - NO FRAME CORRECTIONS, NEED REINSPECTION BEFORE INSULATION
|
INSP - Framing/Rough-in | 10/31/1996 | 11/1/1996 | 11/1/1996 | P | FAIL |
Alan Hauser
|
|
|
|
INSP - Footings | 10/16/1996 | 10/16/1996 | 10/16/1996 | P | PASS |
Alan Hauser
|
|
|
10/16/96 350 - SETBACKS OK, FTNS POURED
|