Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD96-02800
StatusFinaled
Name INDEPENDENT SCHOOL DISTRICT OF
Site Address 6801 N GARY LN
Project NameSCHOOL
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A NEW 134,941 2 STORY JUNIOR HIGH SCHOOL AND ASSOCIATED SITE DEVELOPMENT AS PER APPROVED PLANS. CU#-23-96 - PLANS FOR THIS PROJECT WERE REVIEWED AND APPROVED BY THE STATE OF IDAHO BUILDING AND SAFETY DIVISION.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final11/30/199811/30/199811/30/1998APASS
DetailsCarl Dependahl
fees paid per Linda H...card to Cathy.
Permanent Occupancy 11/30/199811/30/1998 DONE
Details
INSP - Final9/2/19989/2/19989/2/1998ANR
DetailsCarl Dependahl
has t/o; referred to Linda H. Also, will send fax copy c/o card as not all signed in office. keep c/n
INSP - Final8/31/19988/31/19988/31/1998PPART
DetailsCarl Dependahl
cert of value in...to be fee due'd per Linda H.
INSP - Final8/26/19988/26/19988/26/1998PPART
DetailsCarl Dependahl
greg. cert. of value submitted to Linda, firestop ok will chk w/ Linda re ok to issue c/o.
INSP - Final8/24/19988/25/19988/25/1998PFAIL
DetailsCarl Dependahl
2:00 pm Greg 1208 521 8520...need cert. of value, firestop(s) at boiler rm. will recall asap
INSP - Final8/24/19988/24/19988/24/1998AFAIL
DetailsCarl Dependahl
conf only; w/ Greg, proj mgr for Ormond..also need all fees paid per Linda H.
INSP-Final Inspection8/20/19988/21/19988/21/1998APASS
DetailsJoe Tawney
08/21/98 406 - greg 208 521 8520 REINSP OK FOR PERM OCC
INSP - Final8/11/19988/11/19988/11/1998PFAIL
DetailsCarl Dependahl
need fire ok, complete install roll-up doors & actuators, hand rails,etc.
INSP-Final Inspection8/7/19988/7/19988/7/1998 FAIL
DetailsJoe Tawney
08/07/98 406 - greg ###-#### REISP FAIL ROLL DOWN DOORS ELV HEAT DET SPKLR PROT STROBE CANDELLA
INSP - Final8/4/19988/4/19988/4/1998ANR
DetailsCarl Dependahl
conf w/ arch & busd ...work almost complete, will have cont call asap for final
INSP - Final7/30/19987/30/19987/30/1998AFAIL
DetailsCarl Dependahl
no insp; conf w/ Wendall B. & Scott,arch...roll-up doors didn't fit, back-ordered; keep c/n, need complete final l
INSP - Final5/21/19985/21/19985/21/1998 PART
DetailsJoe Tawney
/ / 406 - REVIEWED LOCATION OF SMOKE DETECTORS AND HORN/STROBES SEVERA
INSP - Final5/15/19985/15/19985/15/1998APART
DetailsCarl Dependahl
rec'd resubmittal for oversize penetration assemblies, will verify in field.
INSP - Final5/14/19985/14/19985/14/1998APART
DetailsCarl Dependahl
c/n re: roll up doors, stair rails, firestops, temporary construction, doors and smoke seals; has signatures, ok for t/o... card to contractor. These items are to be done asap for final.
INSP - Final5/13/19985/13/19985/13/1998 PART
DetailsJoe Tawney
/ / 406 - REINSP OK FOR TEMP OCC
INSP - Final5/13/19985/13/19985/13/1998PCANC
DetailsJoe Tawney
05/13/98 406 - t/o ?? Cancel entered by inspector
INSP - Final5/13/19985/13/19985/13/1998PFAIL
DetailsCarl Dependahl
for t/o...still need fire, will re check later for ok (PROFIT)
INSP - Final5/12/19985/12/19985/12/1998 FAIL
DetailsJoe Tawney
/ / 406 - FINAL FAIL SPKLR SYSTEM AND ALARM SYSTEM ISSUES STILL UNRESO
INSP - Final5/7/19985/12/19985/12/1998PFAIL
DetailsCarl Dependahl
GYM AREA need fire ok
INSP - Final5/7/19985/11/19985/11/1998PFAIL
DetailsCarl Dependahl
FINAL FOR T/O...need all other sig's, fire ok. etc; keep struct c/n
INSP-Alarm Testing5/11/19985/11/19985/11/1998PFAIL
DetailsJoe Tawney
05/11/98 406 - CHRIS/###-#### - ALARM INSP. FINAL FAIL TESTING NOT COMPLETED UNABLE TO SEND SIGNALS OFF PREMISES
INSP-Sprinkler Rough-in/Hydro5/11/19985/11/19985/11/1998PNR
DetailsJoe Tawney
05/11/98 406 - GREG/ ###-#### - SPRINKLER INSP. SPKLR CONTRACTOR NOT ON SITE NOT ABLE TO LOOK AT SPKLRS DUE TO ALARM TES
INSP - Final5/7/19985/7/19985/7/1998PFAIL
DetailsCarl Dependahl
FOLLOW UP TO PROFIT MEETING...keep c/n
INSP - Final5/1/19985/5/19985/5/1998AFAIL
DetailsCarl Dependahl
profit pre final conf....need fire alarm plans submitted & approved,install rated doors, get other t/o's. complete c/n's...etc.
INSP - Final5/5/19985/5/19985/5/1998 PART
DetailsJoe Tawney
05/05/98 406 - "PROFIT" PRE-FINAL CONFERENCE AT SCHOOL...CALL CARL D. 20 FLOYD...HE'S COMING, TOO. PRE FINAL CONF BIG ISSUE ALARM SYSTEM PLANS AND APPROVAL
INSP - Framing/Rough-in5/4/19985/4/19985/4/1998PPART
DetailsCarl Dependahl
no insp, conf w/ bldr, other insp's...for "Profit" meeting sched for 5-5-98
INSP - Final5/1/19985/5/19985/1/1998A
DetailsGeorge Slane
GEORGE, THIS IS PROFIT PRE-FINAL CONF. I CHECKED W/ FLOYD, HE'S STILL AWAITING CORRECT ALARM SUBMITTAL
INSP - Framing/Rough-in4/27/19984/29/19984/29/1998PPART
DetailsCarl Dependahl
Scheduled by Hello!. Contact phone is [8537685]. clg grid b&c
INSP - Framing/Rough-in4/21/19984/21/19984/21/1998PPASS
DetailsWes Worcester
04/21/98 342 - ceiling grid ok in hallways phone is [8537685].
INSP-Sprinkler Rough-in/Hydro4/15/19984/15/19984/15/1998 PART
OK ON HYDRO TEST EXCEPT FDC PIPING OK ON ROUGH IN OF ENTIRE BLDG EXCEPT COVERAGE IN MAINT CHASES
INSP - Framing/Rough-in4/14/19984/14/19984/14/1998PNR
DetailsCarl Dependahl
NW Jr. High...keep c/n re 1hr lid, handrails, etc
INSP - Framing/Rough-in4/14/19984/13/19984/13/1998PNR
DetailsCarl Dependahl
no insp...conf. w/ supt. re previous c/n.
INSP - Framing/Rough-in4/8/19984/8/19984/8/1998PFAIL
DetailsCarl Dependahl
ceiling grid at locker room, kitchen, etc...c/n re firestops at lid & corridor wall at "B", handrails (brackets) thru-out, etc.
INSP - Framing/Rough-in3/31/19983/31/19983/31/1998PPART
DetailsCarl Dependahl
handrails, kitchen clg grid, locker room need consult w/ GS re handrails, brackets protrude .
INSP - Framing/Rough-in3/31/19983/31/19983/31/1998PNR
DetailsCarl Dependahl
CEILING GRID AREA A AND B, ###-####...need seismic braces all areas
INSP - Framing/Rough-in3/31/19983/27/19983/27/1998PPART
DetailsCarl Dependahl
not insp, conf w/ proj. mgr.
INSP - Framing/Rough-in3/27/19983/27/19983/27/1998PNR
DetailsCarl Dependahl
HAND RAILS \\JOE ###-####...not at site...5:00 pm
INSP - Framing/Rough-in3/24/19983/24/19983/24/1998PNR
DetailsCarl Dependahl
not insp, conf w/ greg, proj mgr...need eng's letter of acceptance of structure, etc prior to struct sign-off
INSP - Framing/Rough-in3/13/19983/16/19983/16/1998ANR
DetailsCarl Dependahl
YOU TALKED TO JOE ABOUT THIS ON FRIDAY ###-####...need firestop penetrations at 1hr lid mens, women's shower rms. ok to begin concrete board placement, will reinsp pm
INSP - Framing/Rough-in3/12/19983/11/19983/11/1998PNR
DetailsCarl Dependahl
REV'D PLANS W/ RUSS
INSP - Framing/Rough-in3/11/19983/10/19983/10/1998PNR
DetailsCarl Dependahl
conf. w/ russ re insp's at school...reviewed plan
INSP - Framing/Rough-in2/19/19982/19/19982/19/1998PPART
DetailsCarl Dependahl
part; ok to drop tiles in areas e,g,h...off corridor at classrooms
INSP - Framing/Rough-in2/19/19982/19/19982/19/1998PFAIL
DetailsCarl Dependahl
fire caulking and ceiling\area d g h\###-#### joe hanson keep c/n, need arch's detail for shafts, complete firestops at corr.walls in home ec. area, boiler room, kitchen & band area lids ok to continue
INSP - Framing/Rough-in2/17/19982/18/19982/18/1998PCANC
DetailsWes Worcester
02/18/98 342 - CANCELLED ABD RESCHEDULED BY CONTRACTOR
INSP - Framing/Rough-in2/13/19982/13/19982/13/1998APART
DetailsCarl Dependahl
H WING, NEED COMPLETE TOP OF WLL ASSY PER FIX DETAIL AT SOUTH SIDE E-W CORRIDOR AT 2ND FL...ROOMS OF N-S CORR. OK TODROP TILES. STILL NEED ARCH'S DETAIL FOR SHAFT FIX, KEEP C/N.
INSP - Framing/Rough-in2/11/19982/12/19982/12/1998PPART
DetailsCarl Dependahl
area h ###-#### STILL NEED ARCHS OK FOR SHAFTS...ROOMS OFF CORRIDOR OK TO SET TILE AT GRID
INSP - Framing/Rough-in2/11/19982/10/19982/10/1998PPART
DetailsCarl Dependahl
not frame, conf w/ arch scott & russ
INSP-Sprinkler Rough-in/Hydro2/9/19982/9/19982/9/1998 PART
DetailsJoe Tawney
/ / 406 - PARTIAL ROUGH IN OF SPKLR SYSTEMS 2ND FLR AND PART OF 1ST FL
INSP - Carpentry2/4/19982/3/19982/3/1998AFAIL
DetailsCarl Dependahl
KEEP C/N...NEED DETAIL FOR SHAFTS AND STRUCT PENETRATIONS.
INSP - Framing/Rough-in2/2/19982/2/19982/2/1998PFAIL
DetailsCarl Dependahl
###-#### IF THIS DON'T WORK FOR THIS AFTER NOON. MORNING WOULD BE FINE...need complete firestops & framing
INSP - Framing/Rough-in1/29/19981/30/19981/30/1998APART
DetailsCarl Dependahl
covering class room ceiling/ area e. ###-####...AREA E, 1ST FL; ROOMSIDE CORRIDOR WALLS OK TO INSTALL CLG TILES, NEED RECHK UTIL & ELEC ROOMS, 1HR NOT COMPLETED.
INSP - Conference1/30/19981/29/19981/29/1998PPASS
DetailsCarl Dependahl
W/ SUPT. RE INSTALL OF "TOP-OF-WALL" RESUBMITTED DETAIL; TOLD TO ADD FASTENERS PER SPEC.
INSP - Framing/Rough-in1/28/19981/28/19981/28/1998PPART
DetailsCarl Dependahl
CEILING GRID--FIRE LID--JOE AT ###-####...LOCKER RM AREAS, GRID OK TO GYP.
INSP - Conference1/22/19981/22/19981/22/1998PPASS
DetailsCarl Dependahl
sent fax letter to Scott at lombard-conrad: detail ok if fasteners detailed
INSP - Carpentry1/22/19981/21/19981/21/1998PFAIL
DetailsCarl Dependahl
chk firestopping above clg lines at area E; incomplete, need to submit detail for top of wall at occ sep areas & complete, recall when ready
INSP - Conference1/20/19981/21/19981/21/1998PPASS
DetailsCarl Dependahl
3:00 w/ arch; see if 408 can attend. MET W/ SCOTT, GREG & JOE AT SITE, GOT DETAIL FOR RATED WALL TOP, WILL REVIEW.
INSP - Conference1/20/19981/20/19981/20/1998APASS
DetailsCarl Dependahl
W/ JOE & ARCH....WANT TO SET MEETING W/ RUSS & PROJ. MGR.
INSP - Conference1/20/19981/16/19981/16/1998PPASS
DetailsCarl Dependahl
W/ SUPT. RE: RESPONSE TO C/N'S FOR FIRESTOPS & "TESTED ASSY" OF RATED WALLS; WILL NEED TO MEET W/ ARCH.
INSP-Supply line flush1/16/19981/16/19981/16/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP - Conference1/14/19981/13/19981/13/1998PPASS
DetailsCarl Dependahl
REC'D FIRESTOP SPECS, DISCUSSED W/ SUPT.
INSP - Framing/Rough-in1/12/19981/13/19981/13/1998PPART
DetailsCarl Dependahl
Joe ###-####...clg frame at area B, no access to mezzanine. verbal c/n re roof drains & other penetrations of 1 hr. lid. need detail & backing at hatches, breaks, etc. OK to begin gyp.
INSP - Conference1/7/19981/7/19981/7/1998PPASS
DetailsCarl Dependahl
W/ SUPT. RE SHAFT INSTALL
INSP - Conference1/6/19981/6/19981/6/1998APASS
DetailsCarl Dependahl
W/ RUSS RE SHAFT DETAIL AND ARCH'S LETTER...TYPE 2 HOOD, SHAFT ONLY REQ'D AT STRUCT PENETRATIONS OF RATED CONST.
INSP - Conference12/30/199712/30/199712/30/1997APASS
DetailsCarl Dependahl
W/ SUPT. RE C/N
INSP - Framing/Rough-in12/17/199712/18/199712/18/1997AFAIL
DetailsCarl Dependahl
AREA F AND B CEILING...need arch's detail and clarification re: kitch. duct/ hood type; top of wall closure at rated walls w/ tested assy reference.
INSP - Carpentry12/17/199712/17/199712/18/1997PPART
DetailsCarl Dependahl
12/18/97 340 - AREA F LID....PART
INSP - Conference12/16/199712/15/199712/15/1997PPASS
DetailsCarl Dependahl
W/ RUSS RE JR. HIGH PROJECTS; REVIEWED PLAN.
INSP - Framing/Rough-in12/11/199712/15/199712/15/1997PFAIL
DetailsCarl Dependahl
AREA G, 2ND FL...C/N, NEED VERIFY OTHER R/I'S, FIRESTOP OCC. SEPARATION; INSTALL FIRESTOPS THROUGHOUT,REMOVE NON-FRT WOOD AND WOOD PENETRATIONS. SHOW ALL CEILING FRAMING AT CORRIDOR, ETC.(SHAFTS???)
INSP - Conference12/15/199712/12/199712/12/1997PPASS
DetailsCarl Dependahl
W/ SUPT. RE CLG DETAIL
INSP - Conference12/10/199712/10/199712/10/1997 PASS
DetailsCarl Dependahl
/ / 340 - W/ BILL FULLER, PGR.###-#### RE SMOKE/FIRE DAMPERS AT CORRID
INSP - Conference12/8/199712/5/199712/5/1997APASS
DetailsCarl Dependahl
W/ RUSS RE JR HIGH PROJECTS
INSP - Conference12/2/199712/2/199712/2/1997APASS
DetailsCarl Dependahl
W/ RUSS RE SCHOOL PLAN/ MEETING W/ SUPT & PROJ. MGR.
INSP - Carpentry11/26/199711/26/199711/26/1997PPART
DetailsCarl Dependahl
AREA H LIDS...NEED GYP PER DETAIL AT CORR.
INSP - Framing/Rough-in11/26/199711/26/199711/26/1997PFAIL
DetailsCarl Dependahl
NEED COMPLETE FIRESTOPS, 1HR LID FASTENERS, ETC. INT ROOM PARTITIONS OK TO COVER AREA H&E.
INSP - Conference11/25/199711/25/199711/25/1997PPASS
DetailsCarl Dependahl
W/ BOB A. RE APPROVED VAPOR BARRIER MAT'L
INSP - Framing/Rough-in11/25/199711/25/199711/25/1997PNR
DetailsCarl Dependahl
AREA H; ALSO CHK CLG AT E...HAS C/N
INSP - Framing/Rough-in11/24/199711/24/199711/24/1997PNR
DetailsCarl Dependahl
area H
INSP - Carpentry11/21/199711/19/199711/19/1997PFAIL
DetailsCarl Dependahl
KEEP C/N RE: 1HR CORRIDOR LIDS. DISCUSSED ISSUE W/ RUSS...HE'S DOING SCHOOL AT COLUMBIA VILLAGE. CONTRACTOR HASN'T RESUBMITTED OR RECALLED INSP.
INSP - Miscellaneous11/18/199711/19/199711/19/1997APART
DetailsCarl Dependahl
8 yards poured 11/18/97; MTI ONSITE
INSP - Miscellaneous11/13/199711/13/199711/13/1997PPART
DetailsWes Worcester
11/13/97 342 - TUES= 8 YDS EXTERIOR AND INTERIOR WALLS WED= 8 YDS EXTERIOR AND INTERIOR WALLS RAN OUT OF TIME, WILL CK BK, SPE THURS= 8 YDS EXTERIOR AND INTERIOR WALLS INSPECTOR ON SITE
INSP - Foundation11/10/199711/12/199711/12/1997APART
Details
11/12/97 333 - 11/7- 5 YRDS INTERIOR AND EXTERIOR WALLS 11/10- 10 YRDS, DITO ok pending special insp report
INSP - Carpentry11/7/199711/7/199711/7/1997PPART
DetailsCarl Dependahl
11/07/97 340 - GROUT, MTI ONSITE; 1HR LID AT SEC. E&H. TOOK FROM 342. ne
INSP - Carpentry11/7/199711/7/199711/7/1997 PART
DetailsCarl Dependahl
11/07/97 340 - GROUT, MTI ONSITE; 1HR LID AT SEC. E&H. TOOK FROM 342. ne
INSP - Miscellaneous11/6/199711/7/199711/7/1997ACANC
DetailsWes Worcester
11/07/97 342 - GROUT REPORT=6YDS INTERIOR AND EXTERIOR WALLS
INSP - Miscellaneous11/6/199711/6/199711/6/1997PCANC
Details
given to carl
INSP - Miscellaneous11/5/199711/5/199711/5/1997APART
DetailsCarl Dependahl
8 YARDS OF INTERIOR AND EXTERIOR WALLS MTI ONSITE
INSP - Miscellaneous11/4/199711/5/199711/5/1997APART
DetailsCarl Dependahl
GROUT REPORT//12 YDS INTERIOR AND EXTERIOR WALLS MTI ONSITE
INSP - Carpentry11/4/199711/4/199711/4/1997PPART
DetailsCarl Dependahl
GROUT, MTI ONSITE...
INSP - Foundation11/3/199711/4/199711/4/1997ACANC
Details
11/04/97 333 - 11/03/97 GROUT REPORT 29 YDS INTERIOR AND EXTERIOR WALLS given to carl
INSP - Carpentry11/4/199711/3/199711/3/1997PPART
DetailsCarl Dependahl
MET W/ BRIAN PERRY, MTI SPEC INSP. & SUPT...NEED NEW 1HR LID DETAIL OR USE ORIGINAL, ICBO ES 1632.
INSP - Carpentry10/30/199710/30/199710/30/1997PPASS
DetailsCarl Dependahl
REVIEWING RESUBMITTAL FOR 1HR LID
INSP - Foundation10/30/199710/30/199710/30/1997PCANC
DetailsWes Worcester
10/30/97 342 - GROUT REPORT FOR 10/30/97 16 YRDS INTERIOR AND EXTERIOR W
INSP - Framing/Rough-in10/31/199710/30/199710/30/1997PFAIL
DetailsCarl Dependahl
FRAMING OF 1HR LID AT UPPER CORRIDOR SEC. E & H NOT PER DETAIL SUBMITTED(UL P516) CN...MAY RETURN TO ORIG. PLAN BY ADDING TYPE G SCREWS 2-3" BACK FROM BUTT JOINTS PER ICBO ES # 1632. ALL SCREWS NOT TO BE INTO FURRING AT END JOINTS FOR THIS 2 LAYER ASS'Y.
INSP - Conference10/30/199710/29/199710/29/1997PPASS
DetailsCarl Dependahl
W/ GREG, ORMOND PROJ MGR...REC'D RESUBMITTAL FOR 1HR LID PER UL DESIGN P516(WHAT YEAR???)WILL ADVISE.
INSP - Miscellaneous10/30/199710/29/199710/29/1997APASS
DetailsWes Worcester
did 8 yards of interior and exterior
INSP - Foundation10/27/199710/28/199710/28/1997APART
DetailsWes Worcester
/ / 342 - poured w/spec insp on site as per super....now using wire po verticals and bond beam rebar was in place
INSP - Conference10/24/199710/24/199710/24/1997PPASS
DetailsCarl Dependahl
W/ ORMOND SUPT & PROJ MGR: CALLED ARCH RE 1HR LID DETAILS. MUST FOLLOW SPEC OR RESUBMIT.
INSP - Conference10/23/199710/23/199710/23/1997APASS
DetailsCarl Dependahl
W/ JOE...RE FIRE ASSY. INSPS
INSP - Miscellaneous10/23/199710/23/199710/23/1997PPART
DetailsCarl Dependahl
GROUT REPORT 4.5 YDS INTERIOR AND EXTERIOR WALLS MTI ONSITE, REPORT PENDING
INSP - Wall cover10/23/199710/23/199710/23/1997PPART
DetailsCarl Dependahl
1st layer gyp at 1hr lid, E wing, 2nd fl. NEED TO FOLLOW SCHED. IN ICBO 1632 E FOR FACE LAYER.
INSP - Miscellaneous10/23/199710/22/199710/23/1997A
DetailsAlan Hauser
grout report 17 yards of interior and exterior
INSP - Carpentry10/22/199710/22/199710/22/1997PPASS
DetailsCarl Dependahl
W/ SUPT. & HOBSON. 2:30; CHK'D PLAN DETAIL, DAMPER LISTINGS & INSTALL INSTRUCTION...MET W/ BILL OF HOBSON FABRICATORS.
INSP - Foundation10/21/199710/22/199710/22/1997APART
DetailsCarl Dependahl
GROUT REPORT FOR 10/21/97 12 YDS INTERIOR AND EXTERIOR WALLS MTI ONSITE, PENDING REPORT.
INSP - Carpentry10/21/199710/21/199710/21/1997PPART
DetailsCarl Dependahl
RE CLG FRAMING,DAMPERS; DISCUSSED PLANS W/ CHUCK TINDER, BUSD & MET W/ ORMOND AT SITE
INSP - Framing/Rough-in10/16/199710/20/199710/20/1997PPART
DetailsCarl Dependahl
sec E 2nd fl clg framing at corridor; need specs for ICBO es 1625 for 1hr lid...runners per plan; Need install specs for dampers ,chk w/ Hobson(hvac)
INSP - Miscellaneous10/20/199710/20/199710/20/1997PPART
DetailsCarl Dependahl
GROUT REPORT--FRI IS 16 YARDS EXTERIOR AND INTERIOR WALLS
INSP - Miscellaneous10/16/199710/17/199710/17/1997APART
DetailsCarl Dependahl
PLACED 7 YARDS OF GROUT IN EXTERIOR AND INTERIOR WALLS
INSP - Conference10/17/199710/16/199710/16/1997PPASS
DetailsCarl Dependahl
W/ JOE, SUPT. FOR ORMOND...REQUESTED LISTING & INSTALL INSTRUCTION FOR SMOKE FIRE DAMPERS AT MASONRY WALLS...NEED DETAIL FROM HOBSON FAB. (MECH CONT.) HE WILL ARRANGE OR INFORM HOBSON.
INSP - Foundation10/15/199710/16/199710/16/1997ACANC
DetailsAlan Hauser
10/16/97 350 - REPORT FOR MIKELSON MASONARY FOR 10/15/97 7 YDS to be done by #340
INSP - Foundation10/15/199710/15/199710/15/1997PPART
DetailsCarl Dependahl
10-14 8 yrds interior and exterior walls
INSP - Footings10/13/199710/14/199710/14/1997APART
DetailsCarl Dependahl
10-8 24 YARDS, 10-9 16 YDS, 10-10 8 YDS, 10-13 8 YDS, ALL INTERIOR AND EXTERIOR WALLS. GROUT REPORT FOR PETE MIKELSON MASONARY...MTI ONSITE,REPORT PENDING.
INSP - Foundation10/7/199710/8/199710/8/1997PPART
DetailsCarl Dependahl
10-6 24 YRDS INTERIOR AND EXTERIOR WALLS 10-7 24 YARDS INTERIOR AND EXTERIOR WALLS THIS IS GROUT REPORT FOR MIKELSON MASONRY
INSP - Foundation10/3/199710/1/199710/1/1997APASS
DetailsCarl Dependahl
8 YARDS OF INTERIOR AND EXTERIOR WALLS\10-02-97 32 YARDS OF INTERIOR AND EXTERIOR WALLS THIS WAS CALLED IN AS A REPORT
INSP - Footings9/25/19979/25/19979/25/1997PPART
DetailsCarl Dependahl
09/25/97 340 - grouted on tuesday 15 yards wednesday 7 1/2 yards and thu
INSP - Carpentry9/24/19979/24/19979/24/1997PPART
DetailsCarl Dependahl
09/24/97 340 - WALKED SITE, SPOKE W/ BRIAN, MTI SPEC INSP.
INSP - Conference9/22/19979/23/19979/23/1997APART
DetailsCarl Dependahl
09/23/97 340 - did 8 yards grout inside and out friday
INSP - Footings9/22/19979/23/19979/23/1997APART
DetailsCarl Dependahl
09/23/97 340 - 12 YARDS OF GROUT EXTERIOR/INTERIOR. MTI ONSITE, REPORT P
INSP - Conference9/19/19979/19/19979/19/1997APASS
DetailsCarl Dependahl
MET W/ NEW SPEC INSP(W/MTI)...PERRY BRIAN. DISCUSSED NONCONFORMING INSP REPORTS; MUST BE COMPILED AND ADDRESSED BY ENG.
INSP - Footings9/19/19979/19/19979/19/1997PPART
DetailsCarl Dependahl
09/19/97 340 - poured 14 yards 9/18/97 will call monday and let you know poured saturday. for interior and exterior. spec. inspector on job site.
INSP - Conference9/17/19979/17/19979/17/1997PPASS
DetailsCarl Dependahl
REQUESTED LISTING & INSTALL INSTRUCTION FOR DAMPERS AT 2 HR MASONRY WALL FROM JOE HANSEN, SUPT...TOLD HE NEEDS TO TELL HOBSON(MECH CONTRACTOR) TO GET INFO.
INSP - Footings9/17/19979/17/19979/17/1997PPART
DetailsCarl Dependahl
09/17/97 340 - POUR 15 YARDS OF GROUT INTER EXTER WALLS YESTERDAY AND TO
INSP - Footings9/15/19979/16/19979/16/1997APART
DetailsTom Arcoraci
15 yards exterior and interior SPECIAL INSPECTOR ONSITE
INSP - Carpentry9/12/19979/12/19979/12/1997PPART
DetailsCarl Dependahl
pouring/grout 12 yards interior and exterior today. spec. inspector on job. courtsey call. WALKED JOB W/ SCOTT. SUPT. NOT ONSITE, NEED SPRAY FIREPROOF SPEC'S & CHK W/ MTI.
INSP - Site Preparation9/11/19979/11/19979/11/1997PPASS
DetailsCarl Dependahl
20 YDS OF GROUT INTERIOR AND EXTERIOR WALLS
INSP - Carpentry9/9/19979/9/19979/9/1997PPASS
DetailsCarl Dependahl
09/09/97 340 -
INSP - Footings9/9/19979/9/19979/9/1997PPART
DetailsCarl Dependahl
09/09/97 340 - 24 yards exterior and interior
INSP - Conference9/5/19979/5/19979/5/1997APASS
DetailsWes Worcester
schedule precon at 1:30 -2pm w/fire, arch, 342 and 408
INSP - Conference9/5/19979/5/19979/5/1997PPASS
DetailsCarl Dependahl
09/05/97 340 - PRECON W/ SUPT, ETC. met wendall binghan, scotthansen, ar discussed insp's, eng's reports etc
INSP - Framing/Rough-in9/4/19979/5/19979/5/1997PNR
DetailsCarl Dependahl
09/05/97 340 - GROUTED INTERIOR/EXTERIOR 18 YARDS
INSP - Conference9/4/19979/4/19979/4/1997PPASS
DetailsCarl Dependahl
09/04/97 340 - W/JOE TAWNEY RE FIRE PROTECTION OF OPENINGS, DAMPERS, ETC
INSP - Foundation9/3/19979/4/19979/4/1997PPART
DetailsCarl Dependahl
09/04/97 340 - EXTERIOR AND INTERIOR WALLS
INSP-Sprinkler Rough-in/Hydro9/3/19979/4/19979/4/1997APART
DetailsJoe Tawney
09/03/97 406 - NEED TO TALK TO BELL FULLER LOOKED AT FIRE SMOKE DAMPERS WITH MECH CONTRACTOR
INSP - Wall cover9/2/19979/3/19979/4/1997APART
DetailsCarl Dependahl
09/03/97 340 - GROUTED, 12 YARDS 9/2/97 / WILL CALL 9/3/97/ AND LET YOU POURED TODAY. SPEC. INSPECTOR ON JOB SITE.
INSP - Masonry8/28/19978/29/19978/29/1997APART
DetailsWes Worcester
POURED GROUT
INSP - Conference8/28/19978/28/19978/28/1997APASS
DetailsWes Worcester
SEPT 5 AT 1:30 TO 2:00 ON SITE W/ARCHITECT AND CONTRACTOR
INSP - Conference8/28/19978/28/19978/28/1997 PASS
DetailsCarl Dependahl
/ / 340 - NW JR HIGH SCHOOL; W/ WES RE CONFERENCE SET FOR 9-5-97
INSP - Framing/Rough-in8/27/19978/28/19978/28/1997APART
DetailsWes Worcester
24yrs int. and ext. walls and gounding at 800 and will call in total yrage
INSP - Carpentry8/27/19978/27/19978/27/1997 PART
DetailsCarl Dependahl
/ / 340 - WALKED W/ SUPT. THRU PARTITION FRAMING, STAIRS, FIRESTOPS
INSP - Masonry8/27/19978/27/19978/27/1997PPART
DetailsCarl Dependahl
08/27/97 340 - grouted 17 yards 10/26/97 6 to 12 yards today. spec. insp
INSP - Conference8/26/19978/26/19978/26/1997 PASS
DetailsCarl Dependahl
/ / 340 - w/ JOE, SUPT. FOR ORMOND RE PROCEDURE FOR INSPS
INSP - Framing/Rough-in8/26/19978/26/19978/26/1997PNR
DetailsCarl Dependahl
08/26/97 340 - sheet rocking metal studs. ###-#### joe hansen, please call him as he wasn't sure if you wanted to out on this inspection, he can explain the situation to you ok???
INSP - Masonry8/26/19978/26/19978/26/1997PPART
DetailsCarl Dependahl
08/26/97 340 - grouted 12 yards 8/25/ doing at least 5 yards today, spec site.
INSP - Conference8/22/19978/22/19978/22/1997PPASS
DetailsCarl Dependahl
08/22/97 340 - W/ WES RE HIS INSP & SPEC INSP OF MASONRY
INSP - Masonry8/21/19978/22/19978/22/1997ACANC
DetailsWes Worcester
08/22/97 342 - DID 24 YARD 8/20/97 AND 30 YARDS OF GROUTING 8/21/97/SPEC given to Tom A
INSP - Masonry8/21/19978/21/19978/21/1997 PART
DetailsCarl Dependahl
08/21/97 340 - poured; SPEC INSP ONSITE,PENDING REPORT
INSP - Masonry8/21/19978/21/19978/21/1997 PART
DetailsCarl Dependahl
08/21/97 340 - poured; SPEC INSP ONSITE,PENDING REPORT
INSP - Masonry8/18/19978/19/19978/19/1997APART
DetailsCarl Dependahl
GROUTING 6 YARDS 8:30 A.M. MIGHT DO ANOTHER TRUCK BUT WILL CALL SPEC. INSPECTOR ON SITE.
INSP - Masonry8/19/19978/19/19978/19/1997 PART
DetailsCarl Dependahl
08/19/97 340 - GROUTING 6 YARDS 8:30 A.M. MIGHT DO ANOTHER TRUCK BUT WI INSPECTOR ON SITE.
INSP - Masonry8/18/19978/18/19978/18/1997PPART
DetailsCarl Dependahl
said he was grouting interior and exterior at 8:30 a.m. starting with 5 yards, courtsey call, special inspector on site.
INSP - Masonry8/18/19978/18/19978/18/1997 PART
DetailsCarl Dependahl
/ / 340 - said he was grouting interior and exterior aQUESTED PLAN & C
INSP - Foundation8/7/19978/15/19978/15/1997APART
DetailsWes Worcester
08/15/97 342 - POURING AT 6:30 A.M 2ND FLOOR SLAB special inspector on s
INSP - Foundation8/7/19978/14/19978/14/1997APART
DetailsWes Worcester
08/14/97 342 - POURING 2ND FLOOR SLAB. 2ND FLOOR....poured w/speciaL INS
INSP - Masonry8/13/19978/14/19978/14/1997AFAIL
DetailsWes Worcester
08/14/97 342 - 8:30 in the morning 12 yds of grout and he poured 18 toda place, no clips or web placement in place 1st lift next to locker room
INSP - Foundation8/7/19978/13/19978/13/1997APART
DetailsWes Worcester
08/13/97 342 - POURING AT 6:30 2ND FLOOR SLAB ...SPECIAL INSP ON SITE
INSP - Foundation8/13/19978/13/19978/13/1997 PART
DetailsWes Worcester
/ / 342 - SPEC INSP ON SITE
INSP - Masonry8/12/19978/13/19978/13/1997AFAIL
DetailsWes Worcester
08/13/97 342 - 17 yards of grout poured 8-12-97 and more at 9am on 8-13. BAR 16" OC AND VERBALLY AGREED WITH BY ENG...NEED STAMPED DETAIL SIGNED
INSP - Foundation8/12/19978/12/19978/13/1997PCANC
DetailsCarl Dependahl
poured grout 24 yards 8/12/97 /pouring 11 today, these are interior and exterior walls, spec. inspector on site..given to 342
INSP - Conference8/11/19978/11/19978/11/1997 FAIL
DetailsWes Worcester
/ / 342 - special inspection log not current, left note to update and special inspector log.
INSP - Foundation8/7/19978/11/19978/11/1997APART
DetailsWes Worcester
08/11/97 342 - GOING TO POUR FLOOR SLAB THE REST ON GRADE AT 7:30 A.M.
INSP - Foundation8/11/19978/11/19978/11/1997PPART
DetailsTom Arcoraci
POURED AT 9 A.M. INTERIOR AND EXTERIOR, 18 YARDS. DID 6 YARDS FRIDAY, SPEC INSPECTOR ON SITE. COURTSEY CALL
INSP - Wall cover8/6/19978/6/19978/6/1997PPART
DetailsCarl Dependahl
grouting walls wall 8 a.m. this morning. grouted 22 yds tuesday. spec. inspector on job. MET W/ INSPECTOR ONSITE
INSP - Wall cover8/5/19978/5/19978/5/1997PPART
DetailsCarl Dependahl
08/05/97 340 - message, going to pour(grouting) this a.m. at 10 a.m. yes 23 yards. courtsey call.
INSP - Foundation7/31/19977/31/19978/1/1997PPART
DetailsCarl Dependahl
07/31/97 340 - POURING GROUT 5-MAYBER 6 MORE 9:30 A.M. HAS A ON SITE INS CALL
INSP - Masonry7/30/19977/30/19977/30/1997PPART
DetailsCarl Dependahl
07/30/97 340 - Poured grout 11 yards yesterday and is pouring 5 more yar interior and exterior wall. PEND SPEC INSP REPORTS
INSP - Masonry7/28/19977/28/19977/28/1997PPART
DetailsCarl Dependahl
07/28/97 340 - 12 YARDS TODAY
INSP - Masonry7/25/19977/25/19977/25/1997PPART
DetailsCarl Dependahl
SPEC INSP ONSITE
INSP - Masonry7/24/19977/24/19977/24/1997PPART
DetailsCarl Dependahl
POURING GROUT 9:30 A.M. 6 TO 18 YARDS. SPEC. INSPECTOR ON SITE. ALSO HE SAID HE POURED 24 YARDS 7/23/97 TRIED TO CALL BUT COULDN'T GET THRU TO US. SPEC. INSPECTOR ON SITE.
INSP - Masonry7/22/19977/22/19977/22/1997PPART
DetailsCarl Dependahl
masonry grout interior walls, pouring about 12 yards today/ special inspector on site.
INSP - Masonry7/21/19977/21/19977/21/1997PPART
DetailsCarl Dependahl
special inspector on job site.
INSP - Footings7/14/19977/18/19977/18/1997APART
DetailsTom Arcoraci
INSIDE FOOTINGS spec inspec on site report pending
INSP - Masonry7/14/19977/18/19977/18/1997APART
DetailsTom Arcoraci
INSIDE spec inspec on site report pending
INSP - Masonry7/14/19977/17/19977/17/1997APART
DetailsTom Arcoraci
INSIDE spec inspec on site
INSP - Footings7/14/19977/16/19977/16/1997APART
DetailsTom Arcoraci
INSIDE FOOTINGS spec inspec on site
INSP - Masonry7/16/19977/16/19977/16/1997APART
DetailsCarl Dependahl
GROUTING AT 9 A.M. 6 YARDS PROBABLY DO 16 YARDS INTERIOR WALLS. SPECIAL INSPECTOR ON JOB SITE FROM MPI.
INSP - Wall cover7/15/19977/16/19977/16/1997APART
DetailsTom Arcoraci
COURTSEY CALL 6 YARDS GOING TO 12 TO 18 YARD. STARTING AT 9 O'CLOCK spec inspec on site
INSP - Footings7/14/19977/15/19977/15/1997PPART
DetailsCarl Dependahl
INSIDE FOOTINGS, pend spec insp
INSP - Masonry7/14/19977/15/19977/15/1997Apart
DetailsTom Arcoraci
07/15/97 408 - 8:30 START GROUT
INSP - Masonry7/14/19977/14/19977/14/1997PPART
DetailsCarl Dependahl
2:00 pend spec insp
INSP - Footings7/7/19977/11/19977/11/1997PPART
DetailsWes Worcester
special inspector on site earlier, no one on site in PM
INSP - Wall cover7/11/19977/11/19977/11/1997PPART
DetailsWes Worcester
pouring 7 yards of grout at 9 o'clock. has a special inspector on job site... no one on site in PM
INSP - Footings7/7/19977/10/19977/10/1997PPART
DetailsCarl Dependahl
07/10/97 340 - PENDING SPEC INSP REPORT
INSP - Masonry7/9/19977/10/19977/10/1997APART
DetailsTom Arcoraci
07/10/97 408 - spec on site pend rpt
INSP - Footings7/7/19977/9/19977/9/1997PPART
DetailsCarl Dependahl
07/09/97 340 - PENDING SPEC INSP, CONTACTED CHRIS OF MTI
INSP - Masonry7/8/19977/9/19977/9/1997APART
DetailsCarl Dependahl
07/09/97 340 - pouring grout on the morning pending spec insp
INSP - Masonry7/7/19977/8/19977/8/1997APART
DetailsWes Worcester
pouring grout at 8am special inspector on site
INSP - Masonry7/3/19977/3/19977/7/1997PPART
DetailsCarl Dependahl
07/07/97 340 - pouring 5 yards of grout, PEND SPEC INSP REPORT
INSP - Masonry7/2/19977/2/19977/2/1997PPART
DetailsCarl Dependahl
07/02/97 340 - POURING 6 YEARS 11 O'CLOCK TODAY
INSP - Foundation7/1/19977/1/19977/1/1997PPART
DetailsCarl Dependahl
07/01/97 340 - Pouring grout at 1:30 7 yards
INSP - Masonry6/30/19976/30/19976/30/1997APART
DetailsCarl Dependahl
06/30/97 340 - pouring grout at 10:30; part, pending spec insp report
INSP - Footings6/24/19976/25/19976/25/1997APART
DetailsTom Arcoraci
POURING FOOTINGS AND SLABS AT 6:30 A.M. THIS WIL GO ON WEDNESDAY, THURSDAY & FRIDAY. SPECIAL INSPECTOR ON JOB.
INSP - Masonry6/25/19976/25/19976/25/1997PPART
DetailsCarl Dependahl
06/25/97 340 - GROUT - POURING 6 YARDS INTERIOR WALLS.
INSP - Footings6/23/19976/24/19976/24/1997PPART
DetailsCarl Dependahl
06/24/97 340 - pend spec insp
INSP - Masonry6/24/19976/24/19976/24/1997PPART
DetailsCarl Dependahl
06/24/97 340 - FYI:MASONRY GROUT & INTERIOR WALL - POURING AT 10:30 A.M. TODAY. SPECIAL INSPECTOR ON JOB.
INSP - Conference6/23/19976/23/19976/23/1997 PASS
DetailsCarl Dependahl
/ / 340 - TOLD CONT TO TRY TO HOLD DUST DOWN AS WEV'E HAD COMPLAINT; S
INSP - Masonry6/23/19976/23/19976/23/1997PPART
DetailsCarl Dependahl
06/23/97 340 - GROUT - 6 YARDS AT 10 A.M. ......PEND SPEC INSP
INSP - Footings6/17/19976/19/19976/19/1997APART
DetailsTom Arcoraci
INSP - Foundation6/17/19976/19/19976/19/1997APART
DetailsTom Arcoraci
FND. WALL
INSP - Masonry6/18/19976/19/19976/19/1997APART
DetailsTom Arcoraci
GROUT 6 YARDS POURING AROUND 10 A.M.
INSP - Masonry6/16/19976/17/19976/17/1997APART
DetailsTom Arcoraci
GROUTING AROUND 9 A.M....PENDING SPEC INSP RPT
INSP - Footings6/10/19976/13/19976/13/1997ACANC
DetailsAlan Hauser
06/13/97 350 - POURING 10:30 to be done by #340 ì
INSP - Footings6/10/19976/13/19976/13/1997PPART
Details
06/13/97 333 - FTG -OK FOOTING
INSP - Masonry6/12/19976/13/19976/13/1997ACANC
DetailsAlan Hauser
06/13/97 350 - POURING AT 8 A.M. GROUT to be done by #340
INSP - Footings6/10/19976/12/19976/12/1997PPART
DetailsCarl Dependahl
/ / 340 - INTERIOR FOOTINGS AND FLOOR SLAB
INSP - Footings6/10/19976/12/19976/12/1997PCANC
DetailsAlan Hauser
06/12/97 350 - POUR AT 10:30 to be done by #340
INSP - Foundation6/11/19976/12/19976/12/1997PPART
DetailsCarl Dependahl
06/12/97 340 - grout...PENDING SPEC INSP REPORT
INSP - Footings6/10/19976/11/19976/11/1997APART
DetailsCarl Dependahl
06/11/97 340 - 5 YARDS 9 A.M...pend s.i.
INSP - Footings6/10/19976/11/19976/11/1997PPART
DetailsCarl Dependahl
06/11/97 340 - POURING AT 1 O'CLOCK...pending spec insp.
INSP - Masonry6/9/19976/10/19976/10/1997PPART
DetailsCarl Dependahl
06/10/97 340 - GROUT POURING AT 8:30 A.M...pending spec insp report
INSP - Footings6/4/19976/6/19976/6/1997PPART
DetailsCarl Dependahl
06/06/97 340 - pending spec insp report
INSP - Footings6/4/19976/6/19976/5/1997ACANC
Details
06/06/97 333 - given to Carl
INSP - Masonry6/5/19976/6/19976/5/1997ACANC
Details
06/06/97 333 - given to Carl
INSP - Footings6/4/19976/5/19976/5/1997PPART
DetailsCarl Dependahl
06/05/97 340 - PENDING SPEC INSP REPORT
INSP - Footings6/4/19976/5/19976/5/1997PPART
DetailsCarl Dependahl
06/05/97 340 - NW JR HIGH, TRAN FROM 333 BY 340, PENDING SPEC INSP REPOR
INSP - Foundation6/4/19976/5/19976/5/1997APART
DetailsCarl Dependahl
/ / 340 - FLOOR SLAB, NW JR HIGH; TRAN FROM 333 BY 340
INSP - Masonry6/2/19976/3/19976/3/1997PPART
DetailsCarl Dependahl
06/03/97 340 - grout - 9:30 am. they were scheduled to pour floor slab part, pending spec insp report
INSP - Footings6/2/19976/2/19976/2/1997PPART
DetailsCarl Dependahl
06/02/97 340 - interior footing ... PEND SPEC INSP REPORT
INSP - Foundation6/2/19976/2/19976/2/1997PPART
DetailsCarl Dependahl
06/02/97 340 - PEND SPEC INSP REPORT
INSP - Conference5/30/19975/30/19975/30/1997 PASS
DetailsAlan Hauser
/ / 350 - told and left notice that Carl D. is going to be doing the i would like to set up a meeting.
INSP - Masonry5/29/19975/30/19975/30/1997APART
DetailsAlan Hauser
05/30/97 350 - THEY ARE GROUTING THE MASONRY..WANTED TO LET YOU KNOW went by told and left notice that carl d. is going to be doing the inspe and he would like to set up a meeting
INSP-Conference5/8/19975/8/19975/8/1997PPART
Details
relocation of fdc and piv to side of building, advised to hydro test before covering, want hydraulic calcs on additional restriction due to long line length
INSP - Footings4/28/19974/28/19974/28/1997PPASS
DetailsAlan Hauser
04/28/97 350 - left notice that they don't need to call inspections for inspections, send copies of m.t.i. reports to city
INSP - Footings4/24/19974/25/19974/25/1997PPASS
DetailsAlan Hauser
04/25/97 350 - AFTER 1:30 rebar and ftns ok, front corner
INSP - Footings4/22/19974/23/19974/22/1997PCANC
Details
04/23/97 333 - canceled by Dixi
INSP - Framing/Rough-in3/16/19983/16/19983/16/1997PPART
DetailsCarl Dependahl
4:00 w/ ormond & comm'l const re shafts, reinsp shower area lid SHAFTS OK IF ORIGINAL DETAIL FOLLOWED TO "REMOVE" (COVER) ALL MAJOR STRUCT. ELEMENTS...JOISTS, BEAMS, ETC. OK TO FIRE CAULK NON-CRITICAL ELEMENTS...ALL-THREAD, BRACES, ETC. OK TO COVER SHOWER COMPARTMENT AT MENS LOCKER ROOM