Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD96-02863
StatusFinaled
Name NOAH CARTER
Site Address 2675 WARM SPRINGS AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To build a new 5316 s.f. 2-story single family dwelling with 2086 s.f on the 1st floor; 2086 s.f on the 2nd floor, thiis permit also includes a 1692 s.f. detached two-story Garage\guesthouse with 605 s.f. garage; 632 s.f. living quarters and a 355 s.f. attic space. All per the approved plans and attached notes. ACHD # 97-0007 PR # 844 THIS PROJECT BECAUSE OF THE MAGNITUDE OF THE REQUIRED INSPECTIONS AND THE EXTENSIVE ENGINEERING, INSPECTIONS WILL BE PERFORMED AND ACCEPTED IN WRITING BY THE ENGINEER OF RECORD FOR ALL ENGINEERED SYSTEMS; THIS IN NO MEANS EXEMPTS THE BUILDING DEPARTMENT FROM THE OPPORTUNITY TO DO THE SAME. THE BUILDING INSPECTOR WILL BE NOTIFIED OF ALL REQUIRED INSPECTIONS PRIOR TO ANY COVER OF FRAMING OR REINFORCING. THE COVER OF SUCH WILL NOT BE WITHOUT THE NOTED CONSENT OF THE ASSIGNED INSPECTOR OF THIS PROJECT. ALL CONSTRUCTION MUST BE IN CONFORMANCE WITH THE BOISE CITY FLOOD PLAIN ORDINANCE. FLOOD PLAIN CERTIFICATES ARE TO BE SUBMITTED PRIOR TO CALLING FOR A ROUGH FRAMING INSPECTION.... 1994 UNIFORM BUILDING CODE.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final1/6/19991/6/19991/6/1999PPASS
DetailsWes Worcester
INSP - Final9/14/19989/14/19989/14/1998 PEND
Bond posted for mechanical corrections Cathy issued lc this date.
INSP - Final9/10/19989/10/19989/10/1998 FAIL
DetailsWes Worcester
/ / 342 - ###-####, 2733
INSP - Framing/Rough-in9/10/19989/10/19989/10/1998PNR
DetailsWes Worcester
09/10/98 342 - NOAH ###-#### GATE CODE IS *2733
INSP - Final9/3/19989/3/19989/3/1998 FAIL
DetailsWes Worcester
/ / 342 -
INSP - Final9/2/19989/2/19989/2/1998PNR
DetailsWes Worcester
09/02/98 342 - noah ###-#### gate code *2733
INSP - Energy code compliance8/12/19978/12/19978/12/1997PNH
DetailsWes Worcester
08/12/97 342 - gate locked and code given did not work
INSP - Conference8/6/19978/7/19978/7/1997APART
DetailsWes Worcester
08/07/97 342 - verify shear nailing to plates and installation of dtraps PER ENGINEERING ON PLAN OR HAVE APPROVED MODIFICATION ON SITE AT ENERGY
INSP - Framing/Rough-in8/4/19978/4/19978/4/1997PFAIL
DetailsWes Worcester
08/04/97 342 - gate comb. *2733 blk rafters at bearing locations, bear penetrations, draft stops, shr nailing, plan on site at reinspection, et
INSP - Conference7/29/19977/29/19977/29/1997 FAIL
DetailsWes Worcester
/ / 342 - walked property and all penetrations not done, draft stoppin walk again at frame
INSP - Energy code compliance7/29/19977/29/19977/29/1997PNR
DetailsWes Worcester
07/29/97 342 - ck'd penetrations, some not done, plumbing inspection not call for frame and we would ck penetrations at that time - after plumbin
INSP - Carpentry7/8/19977/8/19977/8/1997PPASS
DetailsWes Worcester
INSP - Carpentry7/7/19977/8/19977/8/1997ANR
DetailsWes Worcester
no access reschedule for pm
INSP - Conference7/8/19977/8/19977/8/1997PPASS
DetailsWes Worcester
INSP - Masonry7/3/19977/3/19977/3/1997PNR
DetailsWes Worcester
no one on site at 4:15 pm
INSP - Foundation12/17/199612/17/199612/17/1996PPASS
DetailsWes Worcester
INSP - Footings12/4/199612/4/199612/4/1996PPASS
DetailsWes Worcester
APPT. 1:30-2 PM...REINSPECT FOOTING
INSP - Footings12/3/199612/3/199612/3/1996PNR
DetailsWes Worcester