INSP - Final | 6/17/1997 | 6/17/1997 | 6/17/1997 | P | PASS |
|
|
|
06/18/97 338 - Final condosSIGNED THE CARD IN THE FINAL COL COLLECTED TH TO SEND OCC CERTS
|
Permanent Occupancy | | 6/17/1997 | 6/17/1997 | | DONE |
|
|
|
|
INSP - Final | 4/8/1997 | 4/8/1997 | 4/7/1997 | P | PASS |
|
|
|
04/08/97 338 - MADE OK OK FOR THE OFFICE STAFF TO SIGN THE OCC REQ CARD THE BUILDER
|
INSP - Final | 4/7/1997 | 4/7/1997 | 4/7/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP - Final | 4/3/1997 | 4/7/1997 | 4/6/1997 | A | PART |
|
|
|
04/07/97 338 - correction issued B.C.E.C. SIGNED THE TEMP COL
|
INSP-Final Inspection | 4/3/1997 | 4/4/1997 | 4/4/1997 | A | FAIL |
Joe Tawney
|
|
|
04/04/97 406 - FINAL FAIL NEED INFO ON DETECTORS & STROBES IN HANDICAP S TO ASSIST WITH TEST
|
INSP - Energy code compliance | 1/23/1997 | 1/24/1997 | 1/24/1997 | P | PASS |
|
|
|
01/24/97 338 - made ok
|
INSP - Framing/ Rough-in | 1/24/1997 | 1/24/1997 | 1/24/1997 | | PASS |
|
|
|
/ / 338 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 1/21/1997 | 1/22/1997 | 1/23/1997 | P | PASS |
|
|
|
01/23/97 338 - FOAM SEAL.... framing made ok all fire stopping is in pl only
|
INSP - Foundation | 11/1/1996 | 11/1/1996 | 11/1/1996 | P | PASS |
|
|
|
r-bar placed made ok
|
INSP - Footings | 10/31/1996 | 10/31/1996 | 11/1/1996 | P | PASS |
|
|
|
11/01/96 338 - made ok setbacks ok r-bar placed
|