INSP - Grading Inspection | 7/7/1997 | | 7/7/1997 | | PASS |
Rita DeYoung
|
|
|
Final grading and revegetation completed. Released $750.00 bond.
|
INSP - Grading Inspection | 6/18/1997 | | 6/18/1997 | | BOND |
Rita DeYoung
|
|
|
Grading is approved upon receipt of $750.00 bond for fine grading and revegetation. A small area of slope is steeper than 2:1 and will be revised before bond is released.
|
INSP - Letter of compliance | | | 6/18/1997 | | PASS |
|
|
|
Letter of Compliance #13522 issued 6-18-97.
|
INSP - Final | 6/13/1997 | 6/13/1997 | 6/13/1997 | P | NR |
|
|
|
06/13/97 333 -
|
INSP - Final | 6/12/1997 | 6/12/1997 | 6/12/1997 | P | PART |
|
|
|
06/12/97 333 - fDN -OK FOUNDATION need acceptance by engineer and Terry
|
INSP - Final | 6/5/1997 | 6/6/1997 | 6/5/1997 | P | FAIL |
|
|
|
06/06/97 333 - EARLY PM CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Wall cover | 3/18/1997 | 3/18/1997 | 3/18/1997 | P | PASS |
Alan Hauser
|
|
|
03/18/97 350 - nailing as per plan, 7" o.c.
|
INSP - Energy code compliance | 3/12/1997 | 3/12/1997 | 3/12/1997 | P | PASS |
Alan Hauser
|
|
|
03/12/97 350 - insulation ok, ok to cover, there are interior shear wall inspection on the gyp. nailing, told contractor to call in when ready
|
INSP - Framing/Rough-in | 3/12/1997 | 3/12/1997 | 3/12/1997 | P | PASS |
Alan Hauser
|
|
|
03/12/97 350 - FRAME REINSPECT all corrections made on frame
|
INSP - Framing/Rough-in | 3/12/1997 | 3/12/1997 | 3/12/1997 | P | CANC |
Alan Hauser
|
|
|
03/12/97 350 - sent to me twice
|
INSP - Framing/Rough-in | 3/4/1997 | 3/5/1997 | 3/4/1997 | P | PART |
|
|
|
03/05/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 2/25/1997 | 2/27/1997 | 2/27/1997 | A | FAIL |
Jim Storey
|
|
|
02/27/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Footings | 12/18/1996 | 12/19/1996 | 12/19/1996 | A | CANC |
Wes Worcester
|
|
|
ran out of daylight... will do Friday
|
INSP - Foundation | 12/5/1996 | 12/6/1996 | 12/6/1996 | A | PASS |
Wes Worcester
|
|
|
BASEMENT WALLS
|
INSP - Footings | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | PART |
Wes Worcester
|
|
|
repositoning dowel ends and placing dobbies for 3" clearance
|