INSP - Conference | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PASS |
Carl Dependahl
|
|
|
08/21/97 340 - W/ CONT RE FINAL. FINAL DONE BY 342
|
INSP - Conference | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PASS |
Carl Dependahl
|
|
|
08/21/97 340 - W/ CONT RE FINAL. FINAL DONE BY 342
|
INSP - Final | 8/20/1997 | 8/21/1997 | 8/21/1997 | A | CANC |
Wes Worcester
|
|
|
added in the field
|
INSP - Final | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PASS |
Wes Worcester
|
|
|
08/21/97 342 -
|
INSP - Set-back | 8/20/1997 | 8/20/1997 | 8/20/1997 | | |
Alan Hauser
|
|
|
|
INSP - Final | 8/18/1997 | 8/19/1997 | 8/19/1997 | P | FAIL |
Carl Dependahl
|
|
|
NO ACCESS
|
INSP - Final | 8/19/1997 | 8/19/1997 | 8/19/1997 | | FAIL |
Carl Dependahl
|
|
|
08/19/97 340 - NR, NO ACCESS, LEFT WARNING
|
INSP - Energy code compliance | 8/18/1997 | | 8/18/1997 | | PASS |
|
|
|
PER ALAN H...NOTE ON FRAME INSP.
|
INSP - Framing/Rough-in | 12/26/1996 | 12/26/1996 | 12/26/1996 | P | PASS |
Alan Hauser
|
|
|
12/26/96 350 - re-inspection frame ok, insulation ok, ok to cover
|
INSP - Framing/Rough-in | 12/20/1996 | 12/23/1996 | 12/23/1996 | P | PASS |
Alan Hauser
|
|
|
12/23/96 350 - FRAME REINSPECT frame ok, ok to insulate after plbg. approved
|
INSP - Framing/Rough-in | 12/18/1996 | 12/19/1996 | 12/19/1996 | P | NR |
Alan Hauser
|
|
|
12/19/96 350 - not ready, need all three trades approved, and air infilt
|
INSP - Footings | 11/18/1996 | 11/18/1996 | 11/18/1996 | P | PASS |
Alan Hauser
|
|
|
11/18/96 350 - SETBACKS OK, FTNS OK
|