INSP - Final | 4/25/1997 | 4/28/1997 | 4/28/1997 | A | PASS |
Carl Dependahl
|
|
|
04/28/97 340 - OK
|
INSP - Letter of compliance | 4/28/1997 | 4/28/1997 | 4/28/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - LC 7303
|
INSP - Letter of compliance | 4/28/1997 | 4/28/1997 | 4/28/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - LC 7303
|
INSP - Energy code compliance | 3/10/1997 | 3/10/1997 | 3/10/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 -
|
INSP - Framing/Rough-in | 3/10/1997 | 3/10/1997 | 3/10/1997 | P | PART |
Carl Dependahl
|
|
|
03/10/97 340 - FRAMING REINSPECT, OK TO COVER; NEED SHEAR NAILING AT UTI
|
INSP - Energy code compliance | 3/6/1997 | 3/6/1997 | 3/6/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Energy code compliance | 3/5/1997 | 3/6/1997 | 3/6/1997 | A | CANC |
Jim Sly
|
|
|
/ / 316 - Inspection done AM...Cancel
|
INSP - Framing/Rough-in | 2/26/1997 | 2/27/1997 | 2/27/1997 | P | FAIL |
Alan Hauser
|
|
|
02/27/97 350 - corrections posted notfinished, plus double girder truss full support at south wall, i joist missing blocking at bearing
|
INSP - Framing/Rough-in | 2/25/1997 | 2/26/1997 | 2/26/1997 | P | NR |
Carl Dependahl
|
|
|
02/26/97 340 - FRAME REINSPECT...NEED ENG'G ONSITE, WILL RECALL FOR THUR
|
INSP - Carpentry | 2/12/1997 | 2/12/1997 | 2/12/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - CHK'D FOR WALL BRACING, KEEP C/N ON FRAMING
|
INSP - Framing/Rough-in | 2/4/1997 | 2/5/1997 | 2/5/1997 | P | CANC |
Carl Dependahl
|
|
|
02/05/97 340 -
|
INSP - Conference | 1/27/1997 | 1/27/1997 | 1/27/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - LEFT C/N RE TRASH
|
INSP - Carpentry | 1/9/1997 | 1/9/1997 | 1/9/1997 | | NR |
Carl Dependahl
|
|
|
/ / 340 - CHK FOR BRACING, NOT COMPLETE
|
INSP - Footings | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | PART |
Carl Dependahl
|
|
|
12/02/96 340 - POURED W/O INSP, LOOKS OK. NO PLAN
|