INSP - Final | 3/19/1997 | 3/20/1997 | 3/20/1997 | A | PASS |
Jim Storey
|
|
|
03/20/97 301 - FINAL REINSPECT FNL -OK FINAL
|
INSP - Letter of compliance | 3/20/1997 | 3/20/1997 | 3/20/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 13744
|
INSP - Letter of compliance | 3/20/1997 | 3/20/1997 | 3/20/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 13744
|
INSP - Final | 3/18/1997 | 3/18/1997 | 3/18/1997 | P | NR |
Jim Storey
|
|
|
03/18/97 301 - n/r
|
INSP - Energy code compliance | 2/11/1997 | 2/11/1997 | 2/11/1997 | P | PASS |
Jim Storey
|
|
|
02/11/97 301 - INSL-OK INSULATION-ENERGY CODE
|
INSP - Framing/Rough-in | 2/11/1997 | 2/11/1997 | 2/11/1997 | P | FAIL |
Jim Storey
|
|
|
02/11/97 301 - frame reinspect. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED plumbing must be moved no ope w/in 5 ft roof.
|
INSP - Energy code compliance | 2/7/1997 | 2/10/1997 | 2/10/1997 | P | NR |
Jim Sly
|
|
|
02/10/97 316 - Not Ready...Cancel.
|
INSP - Framing/Rough-in | 2/10/1997 | 2/10/1997 | 2/10/1997 | P | FAIL |
Jim Storey
|
|
|
02/10/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 2/10/1997 | 2/10/1997 | 2/10/1997 | | FAIL |
Jim Sly
|
|
|
02/07/97 316 - C/N Not ready for frame insp. Need.......
|
INSP - Framing/Rough-in | 2/7/1997 | 2/7/1997 | 2/7/1997 | | CANC |
Jim Storey
|
|
|
02/07/97 301 - cancled by dave
|
INSP - Wall cover | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | PART |
Jim Storey
|
|
|
as per approved plan and design gyp nail ok
|
INSP - Wall cover | 1/13/1997 | 1/13/1997 | 1/13/1997 | | PART |
Jim Storey
|
|
|
01/13/97 301 - FRBL-OK FIREBLOCKING GWB -OK SHEETROCK NAILING as per design and approved plan.
|
INSP - Footings | 12/18/1996 | 12/18/1996 | 12/18/1996 | P | PASS |
Wes Worcester
|
|
|
|