INSP - Energy code compliance | 1/6/1997 | 1/6/1997 | 1/6/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - INSL-OK INSULATION-ENERGY CODE
|
INSP - Energy code compliance | 1/6/1997 | 1/6/1997 | 1/6/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - INSL-OK INSULATION-ENERGY CODE
|
INSP - Framing/Rough-in | 1/6/1997 | 1/6/1997 | 1/6/1997 | P | PASS |
Jim Storey
|
|
|
01/06/97 301 - FRAM-OK FRAMING
|
INSP - Foundation | 12/3/1996 | 12/3/1996 | 12/3/1996 | P | PASS |
Wes Worcester
|
|
|
HE HAS ALREADY POURED BUT HAD CALLED IN PREVIOUSLY FOR AN INSPECTION. poured but looks ok
|
INSP - Footings | 11/27/1996 | 11/27/1996 | 12/3/1996 | P | PASS |
|
|
|
11/27/96 333 - FTG -OK FOOTING
|
INSP - Foundation | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | NH |
Wes Worcester
|
|
|
no one could be found
|