INSP - Final | 1/10/1997 | 1/10/1997 | 1/10/1997 | P | PASS |
Jim Storey
|
|
|
01/10/97 301 - FINAL FOR C/O??? FNL -OK FINAL routed for signoffs
|
Permanent Occupancy | | 1/10/1997 | 1/10/1997 | | DONE |
|
|
|
|
INSP - Ceiling grid | 1/2/1997 | 1/2/1997 | 1/2/1997 | P | PASS |
Jim Storey
|
|
|
01/02/97 301 - reinspect ceiling UNIT 101 SCLG-OK SUSPENDED CEILING
|
INSP - Carpentry | 12/26/1996 | 12/26/1996 | 12/26/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - CLG GRID; LEFT C/N RE: SEISMIC AND CORRIDOR WALL PENETRATION
|
INSP - Ceiling grid | 12/26/1996 | 12/26/1996 | 12/26/1996 | P | CANC |
Jim Sly
|
|
|
12/26/96 316 - Gave to Carl D...........Cancel.
|
INSP-Sprinkler Rough-in/Hydro | 12/26/1996 | 12/26/1996 | 12/26/1996 | P | PASS |
|
|
|
sprinklers ok, pennetration and damper issues to corridor
|
INSP - Wall cover | 12/9/1996 | 12/9/1996 | 12/9/1996 | P | PASS |
Jim Storey
|
|
|
12/09/96 301 - EARLY PM. FRAM-OK FRAMING
|