Permanent Occupancy | | 7/17/1997 | 7/17/1997 | | DONE |
|
|
|
|
INSP - Final | 7/11/1997 | 7/11/1997 | 7/14/1997 | P | CANC |
Tom Arcoraci
|
|
|
1st floor maturnity ward???
|
INSP - Final | 7/11/1997 | 7/11/1997 | 7/11/1997 | | PASS |
|
|
|
07/14/97 333 - card signed for perm
|
INSP-Conference | 7/9/1997 | 7/9/1997 | 7/9/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF ON REMAINING ITEMS FOR PERM OCC LETTER FROM HOSP ON SYN RECORD OF SIGNALS SENT TO CENTR STATION
|
INSP - Final | 7/7/1997 | 7/7/1997 | 7/7/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL FAIL ITEMS ON CORRECTION NOTICE NOT COMPLET
|
INSP-Final Inspection | 6/30/1997 | 6/30/1997 | 6/30/1997 | | PART |
|
|
|
FINAL REINSP OK FOR TEMP OCC STROBE LOCATION IN HALLS PATIENT ROOM DET SYSTEM
|
INSP-Final Inspection | 6/26/1997 | 6/26/1997 | 6/26/1997 | P | FAIL |
Joe Tawney
|
|
|
06/26/97 406 - FINAL FAIL TAG EXT REMOVE KEY LOCK FROM COURTYARD DOOR SU
|
INSP - Ceiling grid | 6/12/1997 | 6/12/1997 | 6/12/1997 | P | PASS |
|
|
|
06/12/97 338 - made ok to cover will final check at the final
|
INSP-Conference | 4/25/1997 | 4/25/1997 | 4/25/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - LOOKED AT CEILING DOME REGARDING SPKLR PROTECTION WILL CHECK DETERMINATION
|
INSP - Framing/Rough-in | 3/28/1997 | 3/31/1997 | 3/30/1997 | A | PASS |
|
|
|
03/31/97 338 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 3/19/1997 | 3/19/1997 | 3/19/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - north west corner first three rooms and corador ok to cover.
|
INSP - Framing/Rough-in | 3/17/1997 | 3/18/1997 | 3/17/1997 | A | NR |
|
|
|
03/18/97 338 - BLDG 5 BUILDING # 5??? NEED PHONE # AND LOCATION
|
INSP - Framing/ Rough-in | 3/17/1997 | 3/17/1997 | 3/17/1997 | | PART |
|
|
|
/ / 338 - partial done by 3011
|