Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD96-03189
StatusExpired
Name LANDER STREET SEWER PLANT
Site Address 790 N LANDER ST
Project NameLANDER STREET
Customer Number 
ePlanReviewNo
Description
LANDER STREET WASTEWATER TREATMENT PLANT MODIFICATION * TO FILL IN AN EXISTING BASIN SOUTH OF THE CHLORINE BUILDING AND COMPACT, CONSTRUCT A NEW 100 SQ.FT. U.V. CONTROL BUILDING AT THIS LOCATION. CONSTRUCT A NEW TEMPORARY ROOFED WASTE STORAGE BUILDING NORTH OF CLARIFIER #4, ON EXISTING CONCRETE STEM WALLS. THE WORK TO BE INCLUDED WILL CONSIST OF THE FOLLOWING, ULTRAVIOLET DISINFECTION PROCESS, NEW AERATION BASIN ADDITION, RAKE MODIFICATION FOR CLARIFIER #1, SPECIFIED DEMOLITION AND MODIFICATION TO CATCH BASINS, TANKS AND CLARIFIERS THROUGHOUT THE PLANT. THIS PERMIT WILL INCLUDE AN EXISTING SLAB AND STEM WALLS WHERE THE NEW TEMP. STORAGE BUILDING IS BEING LOCATED (SEE COMMENT SECTION #3). ALL WORK PER THE APPROVED PLANS, ATTACHED COMMENTS AS SPECIFIED IN CONSTRUCTION DOCUMENT VOLUME #1 SECTION 01010. MJP (PC#711-96) CU#-9-95
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Conference10/3/199710/3/199710/3/1997APART
DetailsWes Worcester
left msg w/Kevin requesting report from Heidi re: slab pour already completed
INSP - Site Preparation10/3/199710/3/199710/3/1997APART
DetailsWes Worcester
ADDED BY 342 AS NO ONE AVAILABLE 10/02... poured w/special insp on site....report requested
INSP - Site Preparation10/1/199710/2/199710/2/1997PNH
DetailsWes Worcester
SLAB--POURING FRI AM....EMPLOYEE IN TRAILER DID NOT KNOW @ POUR, DROVE AROUND PROJECT AND COULD NOT FIND ANYONE @ ANY SLAB @ SITE
INSP - Wall cover9/8/19979/9/19979/9/1997APART
DetailsCarl Dependahl
09/09/97 340 - THEY ARE POURING AT 1:00 ...MTI, ENG. ONSITE.
INSP - Foundation9/2/19979/3/19979/3/1997PPART
DetailsCarl Dependahl
09/03/97 340 - EARLY P.M. IF POSSIBLE; MET W/ KEVIN ENGSTROM, P WKS. NEW CLOSURE FND FOR AERATION PIT AT N. SIDE. MTI ONSITE
INSP - Conference8/26/19978/26/19978/26/1997APASS
DetailsBob Archibald
Conference w/contractor regarding letter to Hogland regarding Wes.
INSP - Conference8/7/19978/7/19978/7/1997P
DetailsCarl Dependahl
IN BACK
INSP - Footings8/5/19978/6/19978/6/1997APART
DetailsCarl Dependahl
REBAR
INSP - Masonry7/30/19977/30/19977/30/1997PNR
DetailsCarl Dependahl
07/30/97 340 - puoring concrete this afternoon...NR, GAVE TO TOM A. FOR
INSP - Footings7/22/19977/24/19977/24/1997PPART
DetailsCarl Dependahl
PREFER EARLY PM...SPEC INSP ONSITE. THIS IS 342'S JOB.
INSP - Footings7/17/19977/17/19977/18/1997PNR
DetailsCarl Dependahl
07/17/97 340 - re-bar; UNABLE TO CONTACT
INSP - Footings7/15/19977/16/19977/16/1997AFAIL
DetailsWes Worcester
inadequate cover, wrong splice, not to plan, unsafe ladder & could not access cat walk for wall pour
INSP - Footings7/11/19977/11/19977/11/1997PCANC
DetailsJim Sly
07/11/97 316 - Gave to Wes W.
INSP - Footings7/11/19977/11/19977/11/1997PNR
DetailsWes Worcester
poured w/Gary on site.. still waiting for letter of spec insp authorization.. still bolting together forms.. super wanted me to visually inspect wall pour.. asked him to schedule conf... We were not the problem for late pours!!
INSP - Foundation7/11/19977/11/19977/11/1997PPART
DetailsWes Worcester
2nd interior wall pour ok.. noted unsafe attachment of ladder to access top of forms.. will call safety 7/14
INSP - Conference7/10/19977/10/19977/10/1997PCANC
DetailsCarl Dependahl
07/10/97 340 - WES AND KIM WENT
INSP - Conference7/10/19977/10/19977/10/1997PPART
DetailsWes Worcester
3:00 met w/Gary, Bob, and Heidi, w/Kim on site
INSP - Foundation7/10/19977/10/19977/10/1997PFAIL
DetailsWes Worcester
inadequate cover, incorrect placement of rebar, do not cover 2nd wall....
INSP - Site Preparation7/10/19977/10/19977/10/1997APART
DetailsWes Worcester
ck on spec insp and rebar placement on fill, scheduled conf. w/eng plus public works and bldg dept
INSP - Conference7/10/19977/9/19977/10/1997APART
DetailsWes Worcester
called Trammel and they are in process of performing punch lists
INSP - Conference7/10/19977/9/19977/10/1997APART
DetailsWes Worcester
called turnkey and noted spec insp requirements
INSP - Conference7/10/19977/9/19977/10/1997APART
DetailsWes Worcester
called Gary Lund @ spec insp and need to get handled prior to pour
INSP - Conference7/9/19977/9/19977/9/1997PPART
DetailsWes Worcester
left note to call on front door
INSP - Footings7/9/19977/9/19977/9/1997PNR
DetailsWes Worcester
no one on site at 4:15 pm
INSP - Footings7/9/19977/9/19977/9/1997PNR
DetailsCarl Dependahl
07/09/97 340 - CANT FIND WORK SITE OR CONTRACTOR
INSP - Conference7/7/19977/7/19977/7/1997APART
DetailsWes Worcester
talked w/George and will meet w/Tim later
INSP - Site Preparation7/3/19977/3/19977/3/1997PNR
DetailsWes Worcester
schedule conf w/all concerned
INSP - Conference6/27/19976/27/19976/30/1997APART
DetailsWes Worcester
discussed spec insp criteria w/admin
INSP - Conference6/27/19976/27/19976/27/1997AFAIL
DetailsWes Worcester
could not get a hold of Gary or Trammels
INSP - Conference6/27/19976/27/19976/27/1997AFAIL
DetailsWes Worcester
need special inspector qualification letter and authorization.
INSP - Conference6/27/19976/27/19976/27/1997PPART
DetailsWes Worcester
need construction conference and special inspector letter
INSP - Footings6/26/19976/27/19976/27/1997ANR
DetailsWes Worcester
no one at pour site and no response at p/w or job shack
INSP - Footings5/27/19975/27/19975/27/1997PPART
DetailsCarl Dependahl
05/27/97 340 - part, aeration basin, NW section
INSP - Footings5/15/19975/15/19975/15/1997PNR
DetailsCarl Dependahl
05/15/97 340 - UNABLE TO CONTACT....
INSP - Final5/8/19975/8/19975/8/1997 NR
DetailsJim Storey
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OTH-OTHER AGENCIES NOT APPROVED fire
INSP - Footings4/28/19974/29/19974/29/1997ACANC
DetailsAlan Hauser
04/28/97 350 - didn't get there
INSP - Foundation4/24/19974/28/19974/28/1997ACANC
DetailsAlan Hauser
04/28/97 350 - FLATWORK didn't get there
INSP - Footings4/22/19974/22/19974/22/1997PPASS
DetailsAlan Hauser
04/22/97 350 - rebar for sump basin north side
INSP - Footings4/17/19974/18/19974/17/1997APASS
Details
04/18/97 333 - FTG -OK FOOTING
INSP - Foundation4/16/19974/17/19974/17/1997PPASS
DetailsAlan Hauser
04/17/97 350 - THEY ARE POURING AT 4:00 stem walls ok to pour
INSP - Footings4/15/19974/16/19974/16/1997PPASS
DetailsAlan Hauser
04/16/97 350 - early pm please u.v. basin ftns for control room
INSP - Footings4/3/19974/4/19974/4/1997APASS
DetailsAlan Hauser
04/04/97 350 - REBAR rebar ok for stoop
INSP - Footings4/1/19974/2/19974/2/1997PPASS
DetailsAlan Hauser
04/02/97 350 - cantelevered sidewalks ok
INSP - Footings3/24/19973/25/19973/25/1997APART
DetailsCarl Dependahl
03/25/97 340 - re-bar and footings...PART, CANT FIND JOEL H.(PUB WKS SPE WALLS AT NW OK
INSP - Footings3/12/19973/14/19973/14/1997PPASS
DetailsAlan Hauser
03/14/97 350 - POURING AROUND 2 PM rebar clearances ok, placed as per plan, signed sheet in office
INSP - Carpentry3/11/19973/11/19973/12/1997PCANC
DetailsAlan Hauser
03/11/97 350 - Slab pour at the Lander St. Treatment Plant, would like e possible. had to go to gas co. meeting, as per george slane