INSP - Final | 8/25/1998 | 8/25/1998 | 8/25/1998 | A | PASS |
Carl Dependahl
|
|
|
TCBY SHELL, L/C ONLY, c/n ok; fire/life safety ok; card signed, to cathy
|
INSP - Final | 11/5/1997 | 11/4/1997 | 11/4/1997 | P | PASS |
Carl Dependahl
|
|
|
TCBY SHELL BLDG. OK SIGNED OFF CARD TO CATHY
|
INSP - Final | 11/4/1997 | 11/3/1997 | 11/3/1997 | P | PART |
Carl Dependahl
|
|
|
STRUCT OK, FIRE SPRINKLER ROOM ENCLOSED, NEED ALL SIGNATURES ON CARD FOR L/C. SHELL BLDG FOR TCBY PLAZA.
|
INSP - Final | 11/3/1997 | 11/3/1997 | 11/3/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR CERT OF COMPLETION
|
INSP - Conference | 10/28/1997 | 10/28/1997 | 10/28/1997 | A | PASS |
Carl Dependahl
|
|
|
CALLED ODIE W/ STEED: UNABLE TO ACCESS, HE'LL NEED TO RECALL & HAVE NEW CARD SIGNED OFF FOR C/O OR LC (SHELL BLDG FOR TCBY)
|
INSP - Conference | 10/24/1997 | 10/24/1997 | 10/24/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ 406 RE FIRE REQS
|
INSP - Final | 10/23/1997 | 10/23/1997 | 10/23/1997 | P | FAIL |
Carl Dependahl
|
|
|
. UNABLE TO ACCESS
|
INSP - Conference | 10/22/1997 | 10/22/1997 | 10/22/1997 | A | PASS |
Carl Dependahl
|
|
|
W/ STEED (ODIE)...NEED INSTALL 1HR AT SPRINKLER RM & CALL FOR INSP FOR FINAL.
|
INSP - Final | 10/22/1997 | 10/22/1997 | 10/22/1997 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL FAIL SPKLR ROOM TO BE 1 HR CONSTRUCTION
|
INSP - Conference | 10/23/1997 | 10/21/1997 | 10/21/1997 | P | PASS |
Carl Dependahl
|
|
|
W/ OWNER RE FINAL REQS. TOLD TO CONTACT CONTRACTOR(STEED)
|
INSP-Final Inspection | 6/30/1997 | 7/1/1997 | 7/1/1997 | P | PART |
Joe Tawney
|
|
|
07/01/97 406 - at 1 o'clock TESTED SPKLR MONITORING SYSTEM OK STILL NEED 1 HR SPKLR CONTROL ROOM AND CURB STRIPING
|
INSP - Final | 6/20/1997 | 6/20/1997 | 6/20/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - signed for t/o, need fire . card to owner
|
INSP - Conference | 6/19/1997 | 6/19/1997 | 6/19/1997 | P | PASS |
Carl Dependahl
|
|
|
06/19/97 340 - shell final reqs
|
INSP - Partial final | 6/18/1997 | 6/18/1997 | 6/18/1997 | P | FAIL |
Carl Dependahl
|
|
|
PARTIAL FINAL FOR TEMP.OCC....need other oks; finish ext. work.
|
INSP-Final Inspection | 6/18/1997 | 6/18/1997 | 6/18/1997 | P | PART |
Joe Tawney
|
|
|
06/18/97 406 - partial final for temp.occ. DAN ###-#### FINAL ON SHELL OK FOR TEMP
|
INSP-Supply line flush | 6/11/1997 | 6/11/1997 | 6/11/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND HYDRO TEST
|
INSP-Sprinkler Rough-in/Hydro | 6/3/1997 | 6/3/1997 | 6/3/1997 | P | PART |
Joe Tawney
|
|
|
06/03/97 406 - DON FORRESTER - ###-#### (SHOP #). SPKLR ROUGH IN OK TO COVER
|
INSP-Sprinkler Rough-in/Hydro | 4/21/1997 | 4/21/1997 | 4/21/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - ROUGH IN OF OUTSIDE CANOPY RAISE TWO OBSTRUCTING VENT PIPES
|
INSP - Roof | 3/31/1997 | 4/1/1997 | 4/1/1997 | A | PASS |
Alan Hauser
|
|
|
04/01/97 350 - ROOF NAILING OK, MORE THAN PLAN CALLS FOR, ALSO SOLID BLO NOT H CLIPS.
|
INSP - Footings | 2/24/1997 | 2/25/1997 | 2/25/1997 | P | NR |
Alan Hauser
|
|
|
02/25/97 350 - STEM WALL still being formed up, check pm
|
INSP - Foundation | 2/25/1997 | 2/25/1997 | 2/25/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - stem walls ok, as per plan
|
INSP - Footings | 2/21/1997 | 2/24/1997 | 2/24/1997 | A | PASS |
Alan Hauser
|
|
|
02/24/97 350 - TCBY, EARLY AM PLEASE, AS CLOSE TO 8:00 AS POSSIBLE ftns as per plans, also special inspector on job
|