Permit Information
Permit NumberBLD96-03221
StatusFinaled
Name E.D.S.
Site Address 485 E BAYBROOK CT
Project NameRIVERPOINT CENTER
Customer Number 
ePlanReviewNo
Description
To remodel a 2530 sf portion of the 2nd floor for existing office tenant to increase space from 8,276 sq.ft. to 10,806 sq.ft. per approved plans on file. Work to include removal of approximatly 237lf of existing interior partition wall and rebuilding approximatly 58lf of new interior one-hour rated noncombustible walls, relocation of glazing areas within the rated corridor with existing 1/4 inch wire glass in steel frames included, to reconfigure office and corridor areas per approved plans.. NOTE: This building is fully fire sprinklered. Relocation of fire sprinkler heads to be in compliance with N.F.P.A. 13 as regulated by the Fire Department. (P.C.#727-96) PRP THIS SPACE WAS PREVIOUSLY OCCUPIED BY BROWN AND CALDWELL.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 5/5/19975/5/1997 DONE
Details
INSP - Final4/30/19974/30/19974/30/1997PPASS
DetailsJim Storey
04/30/97 301 - final reinspect FNL -OK FINAL contractor to route sign offs through.
INSP - Final4/28/19974/29/19974/29/1997AFAIL
DetailsJim Storey
04/29/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Final2/26/19972/26/19972/26/1997 FAIL
DetailsCarl Dependahl
/ / 340 - 301 AREA; NO PLAN,ELEC C/N,
INSP - Final2/24/19972/25/19972/25/1997PNR
DetailsJim Storey
02/25/97 301 - TRANS TO CARL.
INSP - Final2/21/19972/21/19972/24/1997PPASS
Details
phase 2 ok
INSP - Framing/Rough-in1/21/19971/21/19971/21/1997PPASS
DetailsJim Storey
01/21/97 301 - FRAM-OK FRAMING
INSP - Temporary occupancy1/9/19971/9/19971/9/1997 PASS
DetailsJim Storey
/ / 301 - TCO -TEMP C OF O ISSUED letters to phase the scope of work approved. pha only approved. rated corridor defincie letter to owner of bldg. archived approved plan. j
INSP - Final1/8/19971/8/19971/8/1997APASS
Details
SMALL TI
INSP - Final1/8/19971/8/19971/8/1997PFAIL
DetailsJim Storey
01/08/97 301 - PHASE I CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Final1/7/19971/7/19971/8/1997PCANC
DetailsJoe Tawney
KEITH ###-#### sent to wrong inspector, rescheduled for wed am