INSP - Occupancy Sign-off | 8/25/1997 | 8/26/1997 | 8/26/1997 | A | PASS |
|
|
|
08/26/97 338 - MADE OK
|
Permanent Occupancy | | 8/26/1997 | 8/26/1997 | | DONE |
|
|
|
|
INSP - Final | 5/30/1997 | 5/30/1997 | 5/30/1997 | | PART |
|
|
|
/ / 338 - signed the temp col as thp/z is only temp col
|
INSP - Final | 5/30/1997 | 5/30/1997 | 5/30/1997 | P | CANC |
|
|
|
05/30/97 338 - Please inspect as late as possible this afternoon. out o 06/02/97
|
INSP - Final | 5/29/1997 | 5/29/1997 | 5/29/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP-Final Inspection | 5/14/1997 | 5/14/1997 | 5/14/1997 | P | FAIL |
Joe Tawney
|
|
|
05/14/97 406 - FINAL FAIL FIRE EXT TOO HIGH EMERG LIGHTS NOT WIRED PROPE
|
INSP - Framing/Rough-in | 4/9/1997 | 4/10/1997 | 4/9/1997 | A | PASS |
|
|
|
04/10/97 338 - FRAM-OK FRAMING c/n removed
|
INSP - Framing/Rough-in | 3/31/1997 | 3/31/1997 | 3/30/1997 | P | NR |
|
|
|
03/31/97 338 - Call Dave @ ###-#### first. not ready OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Framing/Rough-in | 3/11/1997 | 3/13/1997 | 3/12/1997 | A | NR |
|
|
|
03/13/97 338 - Please call first @ ###-#### so owner can unlock for you.
|
INSP - Framing/Rough-in | 3/6/1997 | 3/6/1997 | 3/6/1997 | A | |
|
|
|
Please call David Cusack @ ###-#### before you go.
|
INSP - Framing/Rough-in | 3/4/1997 | 3/4/1997 | 3/4/1997 | P | NR |
|
|
|
03/04/97 338 - Please call owner at ###-#### before you go - the place i would like to meet you there. OTH-OTHER AGENCIES NOT APPROVED NO ACCESS CANCELLED BY OWNER AFTER MY CA
|