Permanent Occupancy | | 8/18/1998 | 8/18/1998 | | DONE |
|
|
|
|
INSP - Final | 8/10/1998 | 8/10/1998 | 8/10/1998 | P | PASS |
|
|
|
08/10/98 333 - struct ok for perm other signatures needed
|
INSP - Final | 8/7/1998 | 8/7/1998 | 8/7/1998 | | PART |
|
|
|
08/07/98 333 - cn placed signed for temp
|
INSP - Final | 8/6/1998 | 8/7/1998 | 8/7/1998 | A | FAIL |
|
|
|
08/07/98 333 - cn placed
|
INSP-Final Inspection | 8/3/1998 | 8/3/1998 | 8/3/1998 | P | PASS |
Rick Jackson
|
|
|
gary ###-#### occ approved
|
INSP-Final Inspection | 7/20/1998 | 7/20/1998 | 7/20/1998 | P | FAIL |
Rick Jackson
|
|
|
requested for 1:30 door release and damper relay not working, extinguisher for kitchen, knox box, updated alarm plans for school
|
INSP - Final | 7/17/1998 | 7/17/1998 | 7/17/1998 | P | NR |
Rick Jackson
|
|
|
gary ###-#### fire inspection couldn't test detectors for roll up fire doors - simplex not available
|
INSP - Final | 6/23/1998 | 6/23/1998 | 6/23/1998 | P | FAIL |
|
|
|
06/23/98 333 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Final | 6/22/1998 | 6/22/1998 | 6/22/1998 | | PART |
|
|
|
/ / 333 - GYM TEMP ONLY
|
INSP - Final | 6/18/1998 | 6/19/1998 | 6/19/1998 | A | FAIL |
|
|
|
06/19/98 333 - not readt
|
INSP - Final | 6/18/1998 | 6/18/1998 | 6/18/1998 | | PART |
|
|
|
/ / 333 - REVIEWED REQ FOR TEMP
|
INSP-Final Inspection | 6/16/1998 | 6/19/1998 | 6/16/1998 | A | |
Rick Jackson
|
|
|
FINAL ###-#### GARY
|
INSP-Final Inspection | 6/10/1998 | 6/15/1998 | 6/15/1998 | P | PART |
Rick Jackson
|
|
|
final/ ###-#### not a final insp. sprinkler system hydro pass - still need to hydro the FDC.
|
INSP-Final Inspection | 6/10/1998 | 6/11/1998 | 6/12/1998 | P | CANC |
Joe Tawney
|
|
|
06/11/98 406 - 200 lb test/ ###-#### postponed to monday per Cathy at Shilo, F_V canceled
|
INSP-Sprinkler Rough-in/Hydro | 6/10/1998 | 6/12/1998 | 6/10/1998 | P | CANC |
Rick Jackson
|
|
|
sprinkler system/ ###-####
|
INSP - Framing/Rough-in | 6/8/1998 | 6/8/1998 | 6/8/1998 | P | FAIL |
|
|
|
06/08/98 333 - not ready
|
INSP - Framing/Rough-in | 5/19/1998 | 5/22/1998 | 5/22/1998 | A | FAIL |
|
|
|
05/22/98 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 5/5/1998 | 5/5/1998 | 5/5/1998 | P | PART |
|
|
|
05/05/98 333 - CEILINGS ON 1ST OK
|
INSP-Final Inspection | 4/23/1998 | 4/27/1998 | 4/27/1998 | A | PART |
Rick Jackson
|
|
|
###-#### jennifer hangers needed in 2nd floor classroom. 1st floor requires heads in high ceiling area with multiple soffits.
|
INSP - Framing/Rough-in | 4/2/1998 | 4/3/1998 | 4/3/1998 | A | PASS |
|
|
|
04/03/98 333 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 3/23/1998 | 3/24/1998 | 3/24/1998 | A | PASS |
|
|
|
03/24/98 333 - alll but ceilings in corridors
|
INSP - Framing/Rough-in | 3/4/1998 | 3/6/1998 | 3/6/1998 | A | PASS |
|
|
|
03/06/98 333 - 1st floor###-####
|
INSP-Final Inspection | 3/4/1998 | 3/6/1998 | 3/6/1998 | A | PASS |
Rick Jackson
|
|
|
###-#### underground flush and rough-in of first floor, move head away from beam in riser room. 2nd floor installation in progress.
|
INSP - Framing/Rough-in | 3/4/1998 | 3/5/1998 | 3/5/1998 | A | PART |
|
|
|
03/05/98 333 - backing to be fire retardent ok to cover all on first flo
|
INSP - Framing/Rough-in | 2/9/1998 | 2/10/1998 | 2/10/1998 | A | PART |
|
|
|
02/10/98 333 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Conference | 2/5/1998 | 2/5/1998 | 2/5/1998 | | PASS |
|
|
|
/ / 333 - resubmittal review
|
INSP - Miscellaneous | 1/7/1998 | 1/7/1998 | 1/7/1998 | P | PART |
|
|
|
01/07/98 333 - CMU BLACK AND BRICK VENEER--METAL STUD WALLS--ROOF SYSTEM GYM--WEEKLY INSPECTION in progress
|
INSP - Miscellaneous | 11/13/1997 | 11/13/1997 | 11/13/1997 | P | PASS |
|
|
|
11/13/97 333 - REPORT FROM HASEGAWA/ SCHEDULE FOR 11/14/97/ LAY CMU BLOC STRUCTURAL STEEL OR METAL DECKING, METAL STUD WALLS, START ROOF SYSTEM O ELECTRICAL, PLMB, AND HVAC R-IN. in progress
|
INSP - Miscellaneous | 11/5/1997 | 11/5/1997 | 11/5/1997 | A | PASS |
|
|
|
OCTOBER-CMU BLOCK AND CONCRETE SLABS. THREE QUARTERS OF THE GYM ROOF TRUSSES AND DECK WERE INSTALLED AND 25 PIECES OF STRUCTURAL STEEL AND 2ND FLOOR DECK INSTALLED. POUR 2ND FLOOR SLAB ON FIR 11-7-97..HASAGAWA ASSOC...DF
|
INSP - Foundation | 9/8/1997 | 9/12/1997 | 9/12/1997 | A | PASS |
|
|
|
CMU BLOCK PLACEMENT, CONCRETE FOOTINGS, SPEC INSPECTOR ON JOB SITE. ok pending special insp report
|
INSP - Foundation | 9/8/1997 | 9/11/1997 | 9/11/1997 | A | PASS |
|
|
|
09/11/97 333 - CMU BLOCK PLACEMENT CONCRETE FOOTINGS SLAB PLACEMENT.SPEC SITE pending special insp reports
|
INSP - Foundation | 9/8/1997 | 9/10/1997 | 9/10/1997 | A | PASS |
|
|
|
CMU BLOCK PLACEMENT, CONCRETE FOOTINGS, SPEC. INSPECTOR ON SITE. ok pending special insp report
|
INSP - Foundation | 9/8/1997 | 9/9/1997 | 9/9/1997 | A | PART |
|
|
|
09/09/97 333 - CMU BLOCK PLACEMENT CONCRETE FOOTINGS, SPEC. INSPECTOR ON ok pending special insp report
|
INSP - Foundation | 8/25/1997 | 8/29/1997 | 8/29/1997 | P | PART |
|
|
|
08/29/97 333 - concrete footing and stem walls, at 2 p.m. spec. inspecto FDN -OK FOUNDATION
|
INSP - Foundation | 8/25/1997 | 8/27/1997 | 8/27/1997 | A | PASS |
|
|
|
08/27/97 333 - pouring footing and stem walls, at 10 a.m. spec. inspecto ok pending special insp reports
|
INSP - Foundation | 8/25/1997 | 8/26/1997 | 8/26/1997 | P | PASS |
|
|
|
08/26/97 333 - pouring at 2:30 concrete footing and stem walls, spec. in MASN-REBAR OK
|
INSP - Foundation | 8/11/1997 | 8/15/1997 | 8/15/1997 | P | PASS |
|
|
|
08/15/97 333 - LAY CMU BLOCK AND GROUT, SPEC. INSPECTOR ON SITE ok pending special insp reports
|
INSP - Foundation | 8/11/1997 | 8/14/1997 | 8/14/1997 | P | PART |
|
|
|
08/14/97 333 - LAY CMU BLOCK AND GROUT, SPEC. INSPECTOR ON SITE pour ok pending special insp report
|
INSP - Wall cover | 8/11/1997 | 8/14/1997 | 8/14/1997 | P | PART |
|
|
|
08/14/97 333 - CONCRETE STEM WALL POUR THURSDAY 2:30 ok pending special insp report
|
INSP - Foundation | 8/11/1997 | 8/13/1997 | 8/13/1997 | P | PASS |
|
|
|
LAY CMU BLOCK AND GROUT SPEC. INSPECTOR ON SITE ok pending special insp reports
|
INSP - Wall cover | 8/11/1997 | 8/12/1997 | 8/12/1997 | P | PASS |
|
|
|
08/12/97 333 - STEM WALL POUR/1:30 P.M. SPEC. INSPECTOR ON SITE Ok pending special inspection reports
|
INSP - Foundation | 8/11/1997 | 8/11/1997 | 8/11/1997 | P | PART |
|
|
|
08/11/97 333 - LAY CMU BLOCK AND GROUT, SPEC. INSPECTOR ON SITE ok pending special inspection report 2nd pour
|
INSP - Foundation | 8/11/1997 | 8/11/1997 | 8/11/1997 | P | PART |
|
|
|
08/11/97 333 - LAY CMU BLOCK AND GROUT SPEC INSPECTOR ON SITE ok pending special inspection report for first pour
|
INSP - Foundation | 7/22/1997 | 7/25/1997 | 7/25/1997 | P | PART |
|
|
|
07/25/97 333 - pouring concrete at 2:30p.m. stem walls. special inspecto ok pending special insp reports
|
INSP - Foundation | 7/22/1997 | 7/24/1997 | 7/24/1997 | P | PART |
|
|
|
07/24/97 333 - pouring at 2:30 p.m. stem walls special inspector on site ok pending special insp reports
|
INSP - Footings | 7/22/1997 | 7/23/1997 | 7/23/1997 | A | PASS |
|
|
|
07/23/97 333 - ok pending special insp
|
INSP - Foundation | 7/22/1997 | 7/23/1997 | 7/23/1997 | P | PART |
|
|
|
07/23/97 333 - stem walls concrete pours at 2:30 special inspector on si pending special insp reports
|
INSP - Wall cover | 7/22/1997 | 7/23/1997 | 7/23/1997 | P | PASS |
|
|
|
07/23/97 333 - ok pending specilal insp reports
|
INSP - Foundation | 7/17/1997 | 7/18/1997 | 7/18/1997 | P | PART |
|
|
|
07/17/97 333 - 2:30 pouring FDN -OK FOUNDATION
|
INSP - Foundation | 7/17/1997 | 7/17/1997 | 7/17/1997 | P | PART |
|
|
|
07/17/97 333 - ok pending special insp reports
|
INSP - Conference | 6/3/1997 | 6/3/1997 | 6/2/1997 | P | PASS |
|
|
|
06/03/97 333 - SAID YOU TOLD HIM YOU WERE AVAILABLE THIS P.M. pre con
|