INSP - Letter of compliance | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 12926
|
INSP - Letter of compliance | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 12926
|
INSP - Final | 8/20/1997 | 8/20/1997 | 8/21/1997 | P | PASS |
Jim Sly
|
|
|
08/21/97 316 - C/C # 12926
|
INSP - Final | 8/19/1997 | 8/19/1997 | 8/19/1997 | P | FAIL |
Tom Arcoraci
|
|
|
08/19/97 408 -
|
INSP - Final | 8/11/1997 | 8/12/1997 | 8/12/1997 | A | FAIL |
Jim Sly
|
|
|
08/12/97 316 - C/N...Need plumb final....
|
INSP - Carpentry | 3/6/1997 | 3/6/1997 | 3/6/1997 | | PASS |
Jim Sly
|
|
|
/ / 316 - Inspection of shear diaphram..garage ceiling. OK
|
INSP - Energy code compliance | 3/5/1997 | 3/5/1997 | 3/5/1997 | P | PASS |
Jim Sly
|
|
|
03/05/97 316 -
|
INSP - Framing/Rough-in | 3/5/1997 | 3/5/1997 | 3/5/1997 | P | PASS |
Jim Sly
|
|
|
03/05/97 316 - FRAME REINSPECT OK
|
INSP - Framing/Rough-in | 2/27/1997 | 2/28/1997 | 2/28/1997 | A | FAIL |
Jim Sly
|
|
|
02/27/97 316 - C/N For wall bracing ...south main floor...point loads, 2 crawlspace.
|
INSP - Framing/Rough-in | 2/26/1997 | 2/27/1997 | 2/27/1997 | P | NR |
|
|
|
02/27/97 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Footings | 1/22/1997 | 1/23/1997 | 1/23/1997 | P | PASS |
Jim Sly
|
|
|
01/23/97 316 - 3:30 OK
|