INSP - Final | 10/30/1997 | 11/3/1997 | 11/3/1997 | P | PASS |
Wes Worcester
|
|
|
11/03/97 342 -
|
INSP - Final | 10/29/1997 | 10/31/1997 | 10/31/1997 | P | FAIL |
|
|
|
10/31/97 333 - unable to inspect owner wont let in
|
INSP - Final | 9/29/1997 | 9/29/1997 | 9/29/1997 | P | FAIL |
Wes Worcester
|
|
|
tempered glass, water proofing @ bathtub, handrails to return, etc
|
INSP - Final | 9/23/1997 | 9/24/1997 | 9/27/1997 | P | NR |
Wes Worcester
|
|
|
call frank at ###-#### or dig. ###-#### so he can meet you there.
|
INSP - Grading Inspection | 9/15/1997 | | 9/15/1997 | | PASS |
Rita DeYoung
|
|
|
Final grading and revegetation approved.
|
INSP - Framing/Rough-in | 7/24/1997 | 7/25/1997 | 7/26/1997 | A | PASS |
Wes Worcester
|
|
|
07/25/97 342 - re-inspect
|
INSP - Framing/Rough-in | 7/10/1997 | 7/10/1997 | 7/10/1997 | A | PART |
Wes Worcester
|
|
|
ok to cover all except West overheighth wall, still waiting on engineering, c/n still on site
|
INSP - Energy code compliance | 7/9/1997 | 7/9/1997 | 7/9/1997 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 7/7/1997 | 7/9/1997 | 7/9/1997 | A | PART |
Wes Worcester
|
|
|
Said that you would meet him there at 8am STILL NAILING SHEAR AND NEED ENG ON OVERHEIGHTH WALLS, ETC
|
INSP - Framing/Rough-in | 7/9/1997 | 7/9/1997 | 7/9/1997 | P | NR |
Wes Worcester
|
|
|
still nailing off shear and awaiting eng for overheighth wall
|
INSP - Framing/Rough-in | 7/3/1997 | 7/3/1997 | 7/3/1997 | P | NR |
Wes Worcester
|
|
|
no one on site as per appointment set by contractor
|
INSP - Framing/Rough-in | 7/7/1997 | 7/3/1997 | 7/3/1997 | A | FAIL |
Wes Worcester
|
|
|
truss eng & eng not done, plans not on site etc
|
INSP - Framing/Rough-in | 6/30/1997 | 7/2/1997 | 7/2/1997 | P | CANC |
Alan Hauser
|
|
|
07/02/97 350 - to be done by #333
|
INSP - Framing/Rough-in | 6/26/1997 | 6/30/1997 | 6/30/1997 | P | CANC |
|
|
|
06/30/97 333 - canceled by contractor
|
INSP - Foundation | 3/13/1997 | 3/13/1997 | 3/13/1997 | P | PASS |
Alan Hauser
|
|
|
03/13/97 350 - WALL REBAR, top half below garage, as per plan (rebar 12"
|
INSP - Foundation | 3/6/1997 | 3/7/1997 | 3/7/1997 | A | PASS |
Alan Hauser
|
|
|
03/07/97 350 - REBAR AS PER PLAN, PLAN CALLS FOR 16" O.C., BUT REBAR IS VERTICAL AND HORIZONTAL
|
INSP - Foundation | 2/21/1997 | 2/21/1997 | 2/20/1997 | P | PART |
|
|
|
02/21/97 333 - south half ok ì
|
INSP - Footings | 2/18/1997 | 2/18/1997 | 2/17/1997 | P | FAIL |
|
|
|
02/18/97 333 - engineers report needed
|