INSP - Final | 5/15/1997 | 5/15/1997 | 5/14/1997 | P | PASS |
|
|
|
05/15/97 333 - RE-INSPECT FNL -OK FINAL
|
INSP - Letter of compliance | 5/14/1997 | 5/14/1997 | 5/14/1997 | | PASS |
|
|
|
/ / 333 - letter #12261
|
INSP - Letter of compliance | 5/14/1997 | 5/14/1997 | 5/14/1997 | | PASS |
|
|
|
/ / 333 - letter #12261
|
INSP - Final | 5/8/1997 | 5/9/1997 | 5/8/1997 | A | FAIL |
|
|
|
05/09/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Energy code compliance | 2/13/1997 | 2/14/1997 | 2/14/1997 | P | PASS |
Jim Storey
|
|
|
02/14/97 301 - INSL-OK INSULATION-ENERGY CODE
|
INSP - Framing/Rough-in | 2/11/1997 | 2/13/1997 | 2/13/1997 | P | PASS |
Alan Hauser
|
|
|
02/13/97 350 - frame ok, check trusses s2 and s2a for plates that were m points on front wall at e.c. inspection
|
INSP - Foundation | 1/21/1997 | 1/21/1997 | 1/21/1997 | P | PASS |
Jim Sly
|
|
|
01/21/97 316 - OK
|