INSP - Final | 4/22/1997 | 4/22/1997 | 4/22/1997 | P | PASS |
|
|
|
04/22/97 338 - final for c/o ok with other agencies
|
INSP-Final Inspection | 4/21/1997 | 4/21/1997 | 4/21/1997 | P | PASS |
Joe Tawney
|
|
|
04/21/97 406 - final for c/o REINSP FOR FINAL OK FOR LETTER OF COMPL
|
INSP - Conference | 4/17/1997 | 4/17/1997 | 4/17/1997 | | PASS |
|
|
|
/ / 338 - cancelled 14 till this pm
|
INSP - Final | 4/16/1997 | 4/17/1997 | 4/17/1997 | A | CANC |
|
|
|
04/17/97 338 - 1ST FLOOR. FINAL FOR C/O made ofor this pm called by mol
|
INSP-Final Inspection | 4/16/1997 | 4/16/1997 | 4/16/1997 | P | FAIL |
Joe Tawney
|
|
|
04/16/97 406 - lst flr. for c/o FINAL FAIL PART OF SMOKE SEAL MISSING ON N END DOOR REQ WITNESS TEST O FIRE DOORS ON HOLD OPENS
|
INSP - Final | 4/2/1997 | 4/3/1997 | 4/3/1997 | A | FAIL |
Jim Sly
|
|
|
04/03/97 316 - FINAL FOR C/O Needs all trade sign offs and fire dept si structural. Verbally told contractor.
|
INSP - Ceiling grid | 3/18/1997 | 3/19/1997 | 3/18/1997 | P | NR |
|
|
|
03/19/97 338 -
|
INSP - Framing/Rough-in | 2/25/1997 | 2/25/1997 | 2/25/1997 | P | NR |
|
|
|
02/25/97 338 - OTH-OTHER AGENCIES NOT APPROVED ELE CORRECTION OK TO PROCEED WITH ELE BLESSING
|
INSP - Framing/Rough-in | 2/18/1997 | 2/18/1997 | 2/18/1997 | P | NR |
|
|
|
02/18/97 338 - THIS WAS A CONFERANCE
|